This page contains a Flash digital edition of a book.
Page 32


www.us-tech.com


March, 2012


ACE: New High Speed Selective Soldering


Spokane Valley, WA — ACE Produc - tion Technologies is presenting its new next-generation KISS-205 fully in-line automated Selective Soldering system. The system effectively splits the process of fluxing, pre-heating and soldering to significantly gain productivity by reducing TAKT by up to 50 percent vs. incre- mental processing. In the KISS-205, a PCB is


fluxed and brought to preheat temperature, then sent to the second conveyor for soldering while concurrently applying flux to and pre-heating the next PCB. This procedure results in virtually doubling the machine’s speed over a con- ventional system. The new machine is a


See us at APEX, Booth 1221


fully configured In-Line SMEMA-compatible selective soldering system that includes as standard features: “Super Quick” motion with closed loop position feed- back with linear encoders for fastest processing times; rapid setup and time to “first production” with the intuitive KISSware off-line program- ming; dual universal PCB edge con- veyor with program controlled width adjustment, positive PCB location and PCB flattening; dual pre-heater modules that are independently con- trolled with optical pyrometers; auto- mated fiducial XY and skew correc- tion; and more programmable fea- tures and innovative components


Dual-belt selective soldering system.


including the user-programmable solder wave flow rate. The machine enables user-definable process opti- mization capabilities reportedly not found in comparable competitive


selective soldering systems. Contact: ACE Production


Technologies, 3010 N. First Street,


Spokane Valley, WA 99216 % 509-924-4898 fax: 509-533-1299 E-mail: sales@ace-protech.com Web: www.ace-protech.com


See at IPC/APEX Booth #1636.


including the company’s advanced design and performance volumetric atomized fluxer and drop jet fluxer. According to the company, the


unit gives the user absolute control over all critical process parameters,


See us at APEX, Booth 1328


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108