This page contains a Flash digital edition of a book.
GLOSSARY HLA. (See High Level Alarms).


HMRT. (See Hazardous Materials Response Team).


Hot Zone. An area immediately surrounding a hazardous materials incident, which extends far enough to prevent adverse effects from haz- ardous materials releases to personnel outside the zone. This zone is also referred to as the “exclusion zone”, the “red zone”, and the “re- stricted zone” in other documents. Law en- forcement personnel may also refer to this as the inner perimeter.


Hydrocarbons. Compounds primarily made up of hydrogen and carbon. Examples include LPG, gasoline and fuel oils.


I


IAP. (See Incident Action Plan). ICS. (See Incident Command System).


ICS Command Staff. Those individuals ap- pointed by and directly reporting to the Inci- dent Commander. These include the Safety Officer, the Liaison Officer, and the Public In- formation Officer (PIO).


ICS General Staff. Section Chiefs are members of the Incident Commander’s general staff, and responsible for the broad response functions of Operations, Planning, Logistics, and Finance/ Administration.


IED. Improvised Explosive Device.


Ignition (Autoignition) Temperature. Mini- mum temperature required to ignite gas or vapor without a spark or flame being present. Significant in evaluating the ease at which a flammable material may ignite.


ILI. (See In-line Inspection Tools).


Immediately Dangerous to Life or Health (IDLH). An atmospheric concentration of any toxic, corrosive or asphyxiant substance that poses an immediate threat to life or would cause irreversible or delayed adverse health ef- fects or would interfere with an individual’s ability to escape from a dangerous atmosphere.


Incident. (1) The release or potential release of a hazardous material from its container into the environment. (2) An occurrence or event, either natural or man-made, which requires ac- tion by emergency response personnel to pre- vent or minimize loss of life or damage to property and/or natural resources


Incident Action Plan (IAP). The strategic goals, tactical objectives and support require- ments for the incident. All incidents require an action plan. For simple incidents (Level I) the action plan is not usually in written form. Large or complex incidents (Level II or III) will require that the action plan be documented in writing.


Incident Command System (ICS). An organ- ized system of roles, responsibilities, and stan- dard operating procedures used to manage and direct emergency operations. May also be referred to Incident Command System (ICS).


Incident Commander (IC). The individual re- sponsible for establishing and managing the overall incident action plan (IAP). This process includes developing an effective organizational structure, developing an incident strategy and tactical action plan, allocating resources, mak- ing appropriate assignments, managing infor- mation, and continually attempting to achieve the basic command goals. The IC is in charge of the incident site. May also be referred to as the On-Scene Incident Commander as defined in 29 CFR. 1910.120.


Incident Command Post (ICP). The “on- scene” location where the Incident Com- mander develops goals and objectives, communicates with subordinates, and coordi- nates activities between various agencies and organizations. The ICP is the “field office” for on-scene response operations, and requires access to communications, information, and both technical and administrative support.


In-line Inspection Tools (ILI). Cylinder shaped plugs of roughly the same diameter of a pipeline that are used to inspect and locate anomalies in the pipeline wall before they can progress to the point of causing a leak.


105

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136