This page contains a Flash digital edition of a book.
RESPONDING TO NATURAL GAS EMERGENCIES


Hazard Control Zones. The designation of areas at a hazardous materials incident based upon safety and the degree of hazard. Many terms are used to describe these hazard control zones; however, for the purposes of this text, these zones are defined as the hot, warm and cold zones.


Hazardous Materials. (1) Any substance or material in any form or quantity that poses an unreasonable risk to safety and health and property when transported in commerce (Source: U.S. Department of Transportation [DOT], 49 Code of Federal Regulations (CFR) 171). (2) Any substance that jumps out of its container when something goes wrong and hurts or harms the things it touches (Source: Ludwig Benner).


Hazardous Materials Group. The ICS organi- zational level responsible for specified haz- ardous materials-related functional assign- ments at an incident.


Hazardous Materials Response Team (HMRT). An organized group of employees, designated by the employer, who are expected to perform work to handle and control actual or potential leaks or spills of hazardous sub- stances requiring possible close approach to the substance. A Hazmat Team may be a sepa- rate component of a fire brigade or a fire de- partment or other appropriately trained and equipped units from public or private agen- cies.


Hazardous Materials Specialists. Individuals who respond and provide support to Haz- ardous Materials Technicians. While their du- ties parallel those of the Technician, they require a more de-tailed or specific knowledge of the various substances they may be called upon to contain. Would also act as a liaison with Federal, state, local and other governmen- tal authorities in re-gards to site activities.


Hazardous Materials Technicians. Individu- als who respond to releases or potential re- leases of hazardous materials for the purposes of stopping the leak. They generally assume a more aggressive role in that they are able to ap- proach the point of a release in order to plug,


104


patch or otherwise stop the release of a haz- ardous substance.


Hazmat. Acronym used for Hazardous Mate- rials.


Hazmat Group. Responsible for all hazmat operations which occur at a hazmat incident. Functions include safety, site control, informa- tion, entry, decontamination, hazmat medical, and hazmat resources.


Hazardous Waste Operations and Emergency Response. Also known as HAZWOPER, this federal regulation was issued under the au- thority of SARA, Title I. The regulation estab- lishes health, safety and training requirements for both industry and public safety organiza- tions that respond to hazmat or hazardous waste emergencies. This includes firefighters, law enforcement and EMS personnel, hazmat responders, and industrial Emergency Re- sponse Team (ERT) members.


HAZWOPER. Acronym used for the OSHA Hazardous Wastes Operations and Emergency Response regulation (29 CFR 1910.120).


High Level Alarms (HLA). Alerting devices that trigger an alarm when storage tanks re- ceiving product from a pipeline are in danger of being overfilled. These alarms typically have two settings—a high alarm and a high-high alarm. The high alarm setting provides an alarm approximately 15 minutes before a tank may be overfilled if it continues to be filled at its maximum calculated fill rate. A high alarm signal may trigger a number of actions, includ- ing immediate communications between the pipeline operations center and personnel from the receiving terminal. If a high-high level alarm signal is received, the pipeline opera- tions center will immediately remotely shut- down the primary supply valve from the pipeline into the receiving terminal.


High Temperature Protective Clothing. Pro- tective clothing designed to protect the wearer against short-term high temperature expo- sures. Includes both proximity suits and fire entry suits. This type of clothing is usually of limited use in dealing with chemical expo- sures.

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136