search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
HEALTHCARE ESTATES


Pipeline equipment for steam systems


ARI-Armaturen, which will be exhibiting on Stand C2, specialises in pipeline equipment for steam systems, thermal oil, and hot water, and is a subsidiary of a large German engineering company, reputed to have the largest valve stock in Europe. It says its ARI ENCOsys steam to water plate


heat exchange systems offer: n Reduced heat loss, thanks to their ‘extremely compact and efficient design’.


n Improved temperature control – a lower setpoint results in larger energy savings as the water flowing through the system is at a lower temperature.


n Thermal efficiency – by heating the secondary water


and sub- cooling the condensate in the same plate heat exchanger, ‘substantial energy savings’ can be achieved.


n Operational savings: ENCOsys requires a minimum level of servicing, which the company can undertake using its own in- house service engineers.


n Instantaneous hot water, ‘whatever the load conditions’, up to 2100 kW without the need for water storage.


Addressing capacity without large upfront spend


ModuleCo Healthcare provides what it describes as ‘state-of-the-art’ modular facilities for NHS Trusts UK-wide, specialising in flexible hire, VAT- recoverable managed service, and ‘Pulse’ solutions that it says help Trusts address clinical capacity issues and access high-quality facilities ‘without large upfront capital investment’. It said: “What sets us apart is our ability to offer a complete end-to-end service, made


affordable through rental, managed service, and usage-based options. Agreements can range from no minimum term up to 15 years. Our team supports every stage of delivery – from business case development and groundwork to installation and fit-out on site. “Alongside clinical buildings, we also


provide modular car park solutions – scalable structures that help reduce delays for patients and staff, improve site flow, and support wider operational goals across the hospital estate. Our true offsite construction approach sees up to 90% of the build completed in a controlled factory environment – minimising disruption to live hospital sites, and enabling faster delivery than traditional methods.” MCH is an accredited supplier on the NHS


Shared Business Services, Crown Commercial Services, and NHS Commercial Solutions frameworks. All facilities meet NHS design, quality, and procurement standards, with finance options tailored to each Trust.


As healthcare estates face growing demands for efficiency, compliance, and innovation, Synbiotix says it ‘stands at the forefront of digital transformation’. Established in 2003, it delivers an


Empowering smarter healthcare estates “With ERIC-compliant waste and cost


reporting, seamless EPR/PAS integration, and intelligent analytics, Synbiotix provides Facilities managers with the tools to reduce waste, improve service delivery, and enhance patient


integrated suite of software solutions – XCater, XClean, XTask, XMaintain, and XAudit – designed specifically for NHS and private healthcare environments. The company explained: “From real-time catering management to cleaning audits and task automation, Synbiotix empowers Estates teams to work smarter, not harder.


108 Health Estate Journal September 2025


Elevating hospital communication


‘In today’s dynamic healthcare landscape, effective communication is vital – not only for operational efficiency, but for ensuring patient safety and the most effective care delivery.’ So says Courtney Thorne, which says its


nurse call systems ‘stand at the forefront of this mission, offering proven solutions designed specifically for NHS hospital environments’. The company said: “Engineered


with precision and reliability, Courtney Thorne’s technology is fully compliant with HTM 08-03 – the UK’s Health Technical Memorandum for bedhead services, ensuring the highest standards in safety, performance, and integration. Our systems are quick to install, with minimal disruption to clinical areas, making them ideal for both new-builds and retrofit projects.” Courtney Thorne continued: “The intuitive design enables real-time alerts and seamless staff coordination, allowing clinical teams to respond to patient needs quickly and effectively. From customisable call points to advanced reporting tools and system integration, every feature is built to support streamlined workflows and improved patient experiences. With built-in staff attack features as standard, fully flexible wired and wire-free architecture, and open protocol at source, solutions are easy to install, adapt, and maintain.”


and visitor experiences. A recent hospital trial saw Emergency Department wait times drop from 25 hours to just one hour, thanks to the real-time task management platform.” Looking ahead, Synbiotix says it is focused on expanding its AI-powered analytics, enhancing system usability, and ‘launching innovative features’ like a visitor food-ordering app, and interactive 3D task mapping, through its partnership with Living Map. It added: “These developments not only streamline operations, but also unlock valuable revenue opportunities.”


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132