This page contains a Flash digital edition of a book.
Table 2. Tensile Properties Solutionizing at 450C (842F) 表2:450C (842F)固溶状态的拉伸性能


Yield Strength (MPa) 屈服强度(MPA)


L1 L2 L3 L4 L5 C1 C2 C3 C4 R1 R2 R3 E1


155 154 159 161 163 162 158 161 168 170 165 165 165


Ultimate Tensile Strength (MPa) 最终拉伸强度(MPa)


189 186 192 195 201 199 177 193 197 194 191 193 189


into the riser. Direct pour is particularly suited to the blade because the liquid metal drop under the filter is moderate (2 in. [50 mm]).


Comparisons Te pouring temperature was adjusted so the predicted


temperature of the liquid metal front during filling would never reach a temperature below the liquidus temperature of aluminum A356 (1,135F [613C]). A pouring temperature of 1,364F (740C) with a 25-second fill time was set for the conventional gating, and a corresponding temperature of 1,274F (690C) with a 10-second fill time was set for the direct pour arrangement. Filling with the conventional gating is shown in Fig. 4; a


corresponding sketch for the direct pour filling is shown in Fig. 5. Tese two modeled fillings show conventional gating loses more superheat during filling due to heat losses in the runners and gates and due to its slower pouring rate. The direct poured blade solidified slightly faster


because of the lower pouring temperature. The thin edge of the blades solidified in about two minutes, while the


比较


通过调节浇注温度,金属液在充型过程中的预测 温度不会低于铝A356的液相线温度(1,135F[613℃] )。传统的浇注系统充型时间是25秒,浇注温度为 1,364F(740℃),而直接浇注的充型时间为10秒,相 应的浇注温度为1,274F(690℃)。


图4为传统浇注系统充型时的模拟图,图 5是直接浇 注的模拟图。这两个模拟图表明,传统浇注系统在充型 中因其在浇道中产生热损失和较慢的充型速率而损失更 多的热量。


由于浇注温度较低,直接浇注的叶片凝固速度略快。 叶片的薄边大约在两分钟内凝固,而铸件的厚端在20分 钟内凝固。


铸件在L,C和E位置的微观结构比较(如图6所示) 。枝晶间隙在这三个位置几乎是相同的;但是:


EIongation (%) 延伸率


2.5


2.05 2.35 3.5 4.1 2.2 1.9 2.1 3.2


2.25 2.25 2.15 2.25


Quality Index (MPa) 质量指数


249 233 247 277 293 251 218 241 272 247 244 243 242


Fig. 4. Modeled filling with the conventional gating is illustrated. 图4:传统浇注系统充型模拟图


Fig. 5. Modeled filling using the direct pour cup is illustrated. 图5:直接浇注系统充型模拟图


48 | FOUNDRY-PLANET.COM | MODERN CASTING | CHINA FOUNDRY ASSOCIATION December 2014


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86