This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
2 PROGRESS WITH EVIDENCE PLAN DOCUMENTS SINCE OETG MTG 1
2.1 Revisions to Background Paper from OETG Mtg 1 5.
A revised version of the Background Paper that was supplied for the OETG MTg 1 has been prepared and circulated to OETG members (document reference: 512608/670- OETG-1 Post Meeting Final - updated 29th October 2013). That revision sought to account for those comments received from Natural England that relate to correcting the account. The Background Paper has not been revised to account for on-going discussions on matters that are, or are not agreed, since that is the purpose of the agreement schedule attached to the minutes.
2.2 Project timetable 6.
The indicative project timeline that was presented in tabulated form in Section 1.4 of the Background Paper to OETG Mtg 1 remains the best available information. No revisions need to be brought to the attention of the attendees of OETG Mtg 2.
2.3 Project description 7.
The project description given in Section 1.3 of the Background Paper to OETG Mtg 1 remains the best available information. No revisions need to be brought to the attention of the attendees of OETG Mtg 2.