This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
This Appendix contains a copy of the following documents that were produced as part of the Evidence Plan process involving the Ornithology Expert Technical Group (OETG):
Evidence Plan OETG Meeting 1 Background Paper; Evidence Plan OETG Meeting 1 Minutes;
Evidence Plan OETG Meeting 2 Background Paper; Evidence Plan OETG Meeting 2 Minutes;
Evidence Plan OETG Meeting 3 Background Paper; Evidence Plan OETG Meeting 3 Draft Minutes; and
Schedule of Matters on which East Anglia THREE Limited seek Agreement (draft after OETG Meeting 3).
The background papers for the meetings each contained a series of appendices. Most of those appendices have now been superseded by the material included in the onshore and offshore PEI chapters. The exception is Appendix 1 to the background paper for meeting 3 that made a comparison of seabird species diversity and abundance between the proposed East Anglia ONE, East Anglia THREE and East Anglia FOUR projects. That Appendix 1 has been included with the background paper for meeting 3.
3. Minutes were produced after each meeting. The minutes for the first and second meeting have been approved by the attendees – Natural England and the RSPB. The minutes of the third meeting 3 are still in draft form and, at the beginning of May, are with the attendees (Natural England, the RSPB and Suffolk County Council) for their comment.
4.
The minutes that were circulated after each meeting contained a schedule of matters on which agreement was sought. The version of that schedule is included as a separate document. It is the draft version circulated to attendees with the minutes of the third meeting.