JONATHAN MORTON – ENGINEERING DIRECTOR, BES, UK FACILITY UPGRADES


Ready for gene therapy challenges in the NHS


Jonathan Morton, engineering director of BES, the specialist in design and construction of sophisticated healthcare, pharmaceutical and biopharma environments, discusses the company’s current pharmacy and aseptic suite project at Weston Park Hospital in Sheffield.


3D image of the Chemotherapy Inner Support Area.


Emerging cell gene therapy treatments mean there is a need for specialist facilities to be constructed within hospital pharmacies to enable the use of viral vectors in targeting advanced medicines to the affected part of the body. Weston Park Hospital, part of the Sheffield Teaching Hospitals NHS Foundation Trust, is in the process of realising a two-phase refurbishment project to create a new Advanced Therapy Medicinal Product (ATMP) and Clinical Trials (CT) aseptic suite, along with a refurbished pharmacy Chemotherapy Aseptic Dispensing Unit. An ATMP classification includes


regenerative medicine, personalised treatments and the development of


3D image of the isolator room.


nanomedicines using either a gene therapy medicinal product, a somatic cell therapy medicinal product, or a tissue engineered product. The exacting science of these


preparations requires equally sophisticated storage, reconstitution and handling procedures, specific to each product. Their potentially hazardous nature also demands complex toxicity management to prevent contamination of the medical treatment, or avoid any risk of particle release outside of the controlled area. Designed, engineered and constructed


by BES, the pharmacy and aseptic suite project aims to futureproof the hospital’s drug preparation capabilities on site.


Jonathan Morton


Jonathan Morton is engineering director of BES. With a BEng in building services from UCLan more than 30 years in designing sophisticated environments for the pharmaceutical and life sciences sectors, Jonathan has been a member of the BES


team for over 16 years. He has been engineering director since 2017. Working with BES’ in-house multidisciplinary team, he oversees all aspects of programme, design, technical and commercial considerations, ensuring the project outcome benefits from exceptional, design, value, quality and safety for their projects.


His expertise includes design, management, SHE, validation and GMP (Good Manufacturing Practice).


92


Project scope We were appointed as both principal designer and principal contractor for the project, with responsibility for maintaining business as usual within the fully- operational hospital. All construction works have to be delivered in the live healthcare environment, considering the needs of clinicians, service users and patients. The avoidance of any interruptions is a critical success factor for the project. The project is being developed in two


phases. Redundant office space on the sixth floor has been refurbished to create a new, high-specification chemotherapy aseptic dispensing facility in phase one, allowing the hospital’s pharmacy team to move across to the completed accommodation. The former pharmacy is now being refurbished as the new aseptic suite with sophisticated CT and ATMP preparation facilities.


Design development Due to the project’s specialist nature, the hospital needed a partner that was proven across the design and construction requirements. Working with our multidisciplinary team has meant the hospital team could collaborate with a single company, ensuring every aspect of the project has been joined up, with


IFHE DIGEST 2022

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116