search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Page 46 Glenbrook


www.us-tech.com Production TE CHNOLOG IES X-ray technology like no other


Innovation in Work Platforms Expedites


Warehouse Logistics By Del Williams


is driving warehouse, distribution, and fulfillment centers to utilize larger structures, automated systems, and engineered elevated work platforms that can deliver faster logistics and shipping. As a case in point, Steel King Industries, a leading manufacturer


W


of material handling products and systems for improving operational ef- ficiency in manufacturing, assembly, distribution centers, storage facil- ities, and warehousing, has created a new independently operated busi- ness unit, called NexCaliber Structures, focused solely on supplying turnkey solutions for engineered elevated work platforms. The approach will accommodate increasingly important new


technology such as automated picking systems, robotic automated storage and retrieval system (ASRS), and massive e-commerce fulfill- ment centers. Warehouse inventory management used to be labor intensive.


Jewel Box X-ray Inspection Systems - Ultra-High Resolution, Microfocus X-ray Tubes, and Five-Axis Positioners


Superior Quality and Unsurpassed Reliability      


Total Flexibility - Full Rotation and Tilt Control


   


Today, the product picking process is much faster and increasingly utilizes automation, whether through robots or conveyors. However, on larger projects, platform structures are crucial. The platform structures are the first product to the jobsite and serve as the foun- dational, multi-level structures upon which all other products — from racking and robots to conveyors — are built and integrated. So, if platform structures are not designed, constructed, and in-


stalled correctly, lengthy project delays and complications are virtually inevitable. “Because warehouse equipment OEMs and contractors inte- grate other product on, in, around, and on top of elevated structures, nothing else can happen until the platforms are in place and opera- tional,” says Brian Pfannes, VP of supply chain at Steel King. While platform products are not new, next-level custom, yet scal-


able, turnkey solutions that utilize 3D modeling, data extraction, and DFM can now minimize complications, compress project timelines, and improve reliability. According to Pfannes, in the market, the time between purchase


order, installation, and required start up is always decreasing so warehouse equipment OEMs and integrators and are always looking for a quicker, more efficient process. He notes that advances in para- metric estimation, the ability to project cost and duration based on predefined algorithms such as materials and square footage, can help to expedite the process from the start. “With parametric estimating technology (PET), we create a 3D


model of the platform with a CAD program. Then from the model we extract data, such as material, weight, and paint coverage. This is passed into a database and paired with costs, and the result becomes the estimate,” he says. Pfannes says that this approach can provide more accurate quotes on large, complex platforms in as little as one hour, when traditionally it might take a day. It also enables OEMs and integrators to seamlessly interface


Repeatable Inspection     


Also available, refurbished and demo systems at reduced prices.


800-600-8866 Request A Quote


Glenbrooktech.com See at SMTAI, Booth 3120


their product with the structures. “This helps to expedite the entire process from design engineering and drafting to production, installa- tion, and start up,” he explains. While these structures are installed inside both new and exist-


ing buildings, within existing buildings, anything already in place such as building columns and electrical panels could interfere with the design. The new approach minimizes such problems. 3D model- ing enables OEMs and integrators to overlay their models onto the platform structures. While the warehouse storage and logistics industry has long fo-


cused on racking and labor-intensive forms of material handling, the rise of e-commerce has made larger automated systems, integrated with work platforms and the building, more critical than ever. To speed the process of successfully implementing such systems from concept to installation and start up, the sooner warehouse equipment OEMs and integrators investigate advanced platforms using 3D mod- eling design, data extraction, and DFM, the greater their advantage


over the competition. Contact: Steel King Industries, Inc., 2700 Chamber Street,


Stevens Point, WI 54481 % 715-254-1412 E-mail: marketing@steelking.com Web: www.steelking.com r


arehouse OEMs and integrators can accelerate successful project completion of even increasingly complex, automated systems with advanced platforms. The growth of e-commerce


October, 2021


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104