FEATURE NEVER ASSUME


What does writing a workable Request for Proposal entail? Louis McGarry, Sales and Marketing Director at Centiel UK, breaks down the essentials.


When purchasing new equipment or replacing a legacy system, inevitably facilities managers will become involved in writing a Request for Proposal (RFP). As manufacturers of UPS systems designed to protect critical loads, the most common mistake we see is the tendency to ‘get a quote based on what we had last time’.


There is no doubt that power protection is a complicated subject. However, adopting a ‘let’s replace like for like’ approach fails to take advantage of the latest advancements in technology which can save on running costs, the overall efficiency and total cost of ownership of the system. Buying ‘like for like’ also may not take into consideration the behaviour of the load over time, which may effect efficiency and costs, as well as adding risk.


Every site and installation is unique and has its own specific needs. Detailing these within the RFP can help ensure facilities managers deliver the right solution in budget and on time.


So, to write a workable RFP, what information should be considered?


Objectives Detail the overall objective of the new or replacement UPS. Defining what the critical load is and its importance, allows the power, autonomy and resilience requirements to be established.


Resilience Creating resilience means removing single points of failure to guarantee an appropriate level of power protection. Increasing resilience needs to be balanced with cost and risk. Consider prioritising resilience as this will help mitigate risk and remove any unplanned costs associated with loss of load.


Power Understanding the historic behaviour of the load can determine future load increases or decreases, and help define the required power rating for your UPS. Oversizing, can result in an inefficient UPS system and unnecessary CapEx. Undersizing puts the load at risk and can be just as costly as this requires spending more to resolve the issue.


Battery autonomy It is amazing how many RFPs don’t include the level of battery autonomy, also known as runtime. The time the back up power needs to be made available to support the load, depends on site requirements. For example, would ten minutes be enough time to undertake a safe shutdown or transfer to a disaster recovery site? Other sites such as medical facilities, are governed to comply with a set of standards which require a minimum of a one hour runtime.


46 | TOMORROW’S FM


Limitations Within the RFP, detail any limitations on site. The type and size of the UPS may be dictated by the available power at site.


Room size and accessibility can also impact UPS system capability and battery autonomy. Include details of any restrictions, such as access routes, dimensions and floor loading. What about road closures? Is there a need to crane equipment? Sharing this information upfront will save time and issues during the design and implementation stages.


Installers also need to know where their area of responsibility starts and finishes and what elements of the build belong to other contractors and to the client or facility. Including a floor plan as part of the RFP can help to optimise layout for both installation and long- term maintenance.


Maintenance Facilities should understand how much they will need to budget to maintain the UPS system over its operational life. Therefore, best practice would be to include a request for a quote for a minimum of five years’ maintenance including the level of response time required. Technical support should be included as standard. Fully comprehensive preventative maintenance contracts, where all repairs and labour are included are ideal for clients who don’t want unbudgeted expenses.


Avoid assumptions and appreciate that the more information provided, the more accurate the proposal will be. If in doubt, ask your supplier to conduct a full site survey to establish the power, autonomy and resilience required to protect the critical load.


www.centiel.co.uk


twitter.com/TomorrowsFM


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72