This page contains a Flash digital edition of a book.
Page 72


Prototron Circuits Quickturn PCBs Since 1987


America’s Board ShopTM 


 RoHS      5                





                     


www.us-tech.com


April, 2012


Finetech: Professional Rework Systems


Berlin, Germany — Finetech is pre- senting two professional rework sys- tems — the FINEPLACER® core plus and the FINEPLACER pico rs. The FINEPLACER core plus is a com- pact, yet versatile rework system that offers a level of profes- sionalism that exceeds its attractive price. The system offers proven rework technolo- gy for a wide spectrum of SMD components, ranging in size from 0201 to 70 x 70mm. This compact rework sta-





tion is based on the company’s proven technology, integrating the complete rework cycle into an efficient design, without diminishing functionality. The system is at home in produc- tion environments where process reproducibility is cru- cial. The large area under- board heater for PCBs supports board sizes of up to 400 x 310mm. The FINEPLACER pico rs is an


The system has a placement


accuracy of better than 5µm, high- efficiency board heating, closed-loop force control as well as automated top heater calibration. The system- to-system process transfer capability


FINEPLACER pico rs rework system.


enhanced hot air rework station for assembly and rework of all types of SMD components. The system is excellent for professional mobile device rework in challenging high- density environments. The system provides Integrated


Prototron.com See us at Electronics New England, Booth 1033


Process Management (IPM) with syn- chronized control of all process mod- ules and their related parameters: top and bottom (pre-)heating and cooling, temperature, time, power, flow, light and vacuum. Process gas can be seam- lessly integrated into the reflow process for significantly improved sol- dering results.


allows worldwide profile allocation with highly reproducible results on all of the company’s modular rework systems. The application range includes the whole rework cycle for 01005, 0201, Package-on-Package (PoP), µBGA/µCSP, leadless compo- nents (QFN/MLF), shielded SMD or reworkable underfilled components,


among others. Contact: Finetech, 8380 S.


Kyrene, Ste. 110, Tempe, AZ 85284 % 480-893-1630 fax: 480-893-1632


E-mail: adrienne@finetechusa.com Web: www.finetechusa.com


See at Nepcon China Booth #1A81.


F+K: Wire Bonders Outside the Mainstream


Munich, Germany — F and K Delvotec’s new wire bonder, the G5- XL had been introduced at produc- tronica 2011 and is at the heart of the company’s diversification strate- gy away from a pure semiconductor business and towards other market segments such as PV manufacturing. The primary targets are solar cells and battery modules for e-vehi-


meter, allowing it to bond large solar cell panels or entire battery modules in a single pass. This greatly simpli- fies the module or panel design. This year, the new bonder has


already found favor with several customers from the solar cell and battery module market segments. Orders have pushed the company’s backlog well into mid-year. Contact:


Large-panel bonder.


cles, and the company has developed a purpose-built wire bonder with an extremely large working area. The new G5-XL bonder, had been intro- duced to great acclaim at productron- ica in Munich and has a gigantic working area of almost one square


F & K Delvotec Inc., 27182 Burbank


Avenue, Foothill Ranch, CA 92610 % 949-595-2200 fax: 949-595-2207 E-mail: info@fkdelvotecusa.com Web: www.fkdelvotec.com


See at Nepcon China Booth #1H37.

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96