13.15.9 The inspections mentioned, as well as the measures referred to, should be integrated into the MASS operational MMS.


13.16 Review


13.16.1 Every management system has a cyclic approach and one of the key stages is review. This enables the Operator to undertake a review of the MMS and SMS and determine its effectiveness and to develop areas for continuous improvement and assurance that it is ‘fit for purpose’ and current in accordance with the latest legislation.


13.16.2 The ISM Code regulates and requires a review period for the safety system and award/retention of its certification. The details of review are as follows:


n Document of Compliance - External audit of system every five years from date of initial issue and an Internal Verification to be conducted by the Operator on an annual basis;


n Safety Management Certificate - External audit of system every five years from date of initial issue and an Internal Verification to be conducted by the Operator between two to three years;


n The Operator should periodically evaluate the effectiveness of the SMS in accordance with procedures established by the Company. The audits and possible corrective actions should be carried out in accordance with documented procedures;


n Therefore, the Operator should carry out internal safety audits on board and ashore at intervals not exceeding 12 months to verify whether safety and pollution-prevention activities comply with the SMS;


n In exceptional circumstances, this interval may be exceeded by not more than 3 months, as agreed with the Authority;


n Personnel carrying out audits should be independent of the areas being audited unless this is impracticable due to the size and the nature of the Company;


n The results of the audits and reviews should be brought to the attention of all personnel having responsibility in the area involved;


n The management personnel responsible for the area involved should take timely corrective action on deficiencies found;


n All records and actions from audit should be retained within the organisations document management system.


ASV Global personnel


Maritime Autonomous Surface Ships up to and including 24 metres in length


65


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84