12.6 Maintenance Procedures and Records 12.6.1 All MASS should be provided with a recommended maintenance schedule from the designer / manufacturer.
12.6.2 Configuration control of maintenance procedures and maintenance records should be assured as part of the Safety Management System and procedures for the operator.
12.7 Responsibilities for records keeping 12.7.1 Survey & maintenance records should be kept up to date by the operator and be readily accessible.
12.7.2 MASS should carry a marking which identifies contact details for examination/inspection of records by the Flag Administration.
Thales MCM USV Trials
Maritime Autonomous Surface Ships up to and including 24 metres in length