35 Final Table result
While no new research is required, prior experience of the technology is considered the most important know-how factor for this project. This prior experience is not available in-house. In this scenario a NO will be reported to the fi nal table.
The Resources to Complete the Task
Having considered whether you have the necessary know how to develop the new detector, the next step is to determine whether suffi cient in-house resources are available to complete the project. Resources is a very generalised term that covers different aspects. This category includes manpower, the fi nance to cover salaries for the term of the project, production of test equipment, prototypes, purchase of necessary tools and so on. It also includes capability of manufacturing the product in the required quantities once the development process is completed.
Internal Resources
Select parameters relevant to availability of internal resources for the project. Answer with Yes or No to each question and determine the importance of each parameter by assigning individual weights to them. A Yes with a high weight (10) means the parameter is very important and possible in-house. A No with a high weight (10) means the parameter is very important and diffi cult to achieve in-house.
Table 2. How to defi ne internal availability of the necessary internal resources to complete the project.
Yes / No Weight (1-10)
Is required tooling already available?
Are any of the required development assets (Hardware/ Software) or test equipment already available in-house?
s it possible, to undertake the project development using a platform already available in-house?
Is suffi cient manpower readily available for the project?
Does facility for prototyping new products exist in-house?
Can the fi nal product be manufactured in the required quantities in- house?
Final Table result
The available internal resources do not cover several important aspects of the project, investment would be necessary fi rst, to close the gap in terms of assets and prototyping. In this scenario a NO will be reported to the fi nal table.
Yes No 2 Final Table result
10 Important factor
Time is a very critical factor for this project as it infl uences other related projects too. Successful completion of the project must be assured within a set time, delays will lead to serious loss of competitive advantage. In this scenario a YES will be reported to the fi nal table.
No
10 Important factor
Putting it all together
The information collected in the three tables described above, needs now to be combined into a single much simpler internal development decision table.
Yes No Yes 5 2 3
Table 4. Internal Development Decision Table. Transfer the results obtained from the three key factor tables above to evaluate the possibility of fulfi lment with internal resources only.
Topic
Is an Internal product
development the best choice?
Know-How No
Internal Resources
No
Little of the prior experience is possessed in-house.
Almost no hardware, software or testing assets relevant to the project exist in-house. No existing platforms are available for modifi cation.
Critical factors behind this analysis
Comment
Time Required to Complete the Development
Time is always the enemy when it comes to innovation. On one hand, creation of a new product needs time, on the other hand, innovation itself is a function of time. For example, what is a great new product today might be ‘common’ or outdated one year later. Development time is typically dictated by the size of the market opportunity, competitive forces and is of course infl uenced by current activities of the company. For example, if the introduction of a complete, new chromatography system is planned that requires a new specialty detector X, then time gains a whole new meaning. Any delay in the development of X would affect a major goal of the company.
Time Consideration Table
Select parameters relevant to the time aspect of the project. Answer with yes or no to each question and determine the importance of each parameter by assigning individual weights to them. A Yes with a high weight (10) means the parameter is very important and possible in-house. A No with a high weight (10) means the parameter cannot is diffi cult to achieve in-house.
Table 3. How to defi ne internal availability of the necessary time to complete the project.
Yes/No Weight (1-10)
Is time taken to complete project critical
Is time taken to complete project critical for related products?
Yes Yes 3 3 Comments
Critical factor
Critical factor
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196