FCoE will deliver better price/performance with better connectivity… why not wait?
• FCoE will not be ready for mission-critical applications for about 12-18 months
• New and other technologies will protect and
leverage the existing FC installed base: –IP can extend FC SANs - it does not have to replace them –iSCSI can co-exist with existing FC systems – NAS Gateways blend with FC SANs to provide flexible solutions