177. A comprehensive and robust impact assessment of the noise impacts likely to arise from the construction, operation, decommissioning of East Anglia THREE have been undertaken. These are summarised in Table 26.32 below. The data and primary analysis makes use of the work undertaken by the proposed East Anglia ONE project. A cumulative impact assessment has been presented which looks at up to three East Anglia Offshore Windfarm projects being developed and considers the impact of the concurrent operation of their onshore project components. In particular three identical converter stations.


178. Some potentially significant impacts have been identified arising from an unmitigated construction works in some locations. However following the implementation of standard mitigation measures these levels can be reduced to a non-significant level.


179. The enduring noise impact from the operation of the project is the noise emissions from the converter station. The converter station is located away from houses and buildings and the operational noise is not considered to be of significant impact. The following predicted impacts for noise and vibration have been identified.


Table 26.32 Potential Impacts Identified for Noise and Vibration Potential Impact Receptor


Value/ Sensitivity


Construction


Impact 1: Increased noise on residential receptors at landfall during construction


Impact 2: Scenario 1 – Pre- installed Ducts


Increased noise on residential receptors along proposed cable route during construction


Ferry Road residences


Medium Medium Moderate


solid site boundary hoarding fence, approximately 2.4m in height


Low Farm Dukes Hill


Cherry Tree Farm


Medium Low Minor Medium Negligible Negligible Medium Low Glebe Farm Medium Low


The Common


Medium Low Minor Minor Minor


BPM working practices


BPM working practices


BPM working practices


BPM working practices


BPM working practices


Negligible Magnitude Significance Mitigation


Residual Impact


Negligible Negligible Negligible Negligible Negligible


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 26 Noise and Vibration Page 49


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58