This page contains a Flash digital edition of a book.
proximity of construction traffic to this receptor is judged to be so small as to make no significant difference to the assessment of noise and vibration impacts on the receptor.


157. This noise and vibration impact decision on Rose Cottage is deemed applicable to East Anglia THREE.


Potential Impacts during Operation


Impact 1: increased noise on residential receptors at the landfall 158. There would be no operational noise effects from the landfall location of the onshore cable route.


Impact 2: increased noise on residential receptors along the onshore cable route 159. There would be small amounts of traffic associated within occasional maintenance of the cable (undertaken at the jointing bays). The noise increase as a result of this traffic and as a result of maintenance works on the cable would be of negligible magnitude on receptors of medium sensitivity and therefore of negligible significance


Impact 3: increased noise on residential receptors from the converter station 160. For both construction scenarios the impacts of the predicted noise levels from the converter station at surrounding residential receptors (medium sensitivity) are presented in Table 26.27. The impacts are defined by comparison with impact criteria within section 26.4.6.3.


161. East Anglia THREE will commit to a requirement limiting operational noise from the converter station to no greater than 35dB LAeq, 5 min at Bullenhall Farm, Hill Farm and Woodlands Farm. The effect of this requirement will be such that noise emissions from East Anglia THREE either alone or in combination with East Anglia ONE (under Scenario 1) will not exceed the prescribed limit. .


Table 26.27 Predicted converter station operational noise impact (worst case concurrent


operation with East Anglia ONE) Location Name


CS1 CS2


CS3 CS4


CS5


Receptor Sensitivity


Black Cottage


Woodlands Farm


Willow Cottage


Preliminary Environmental Information May 2014


Predicted Noise Level


Canes Farm Medium 29 Hill Farm


Medium 30 Medium 25


Medium 30 Medium 28


With Tonal Penalty


34 35


30 35


33 East Anglia THREE Offshore Windfarm


Impact magnitude


Negligible Negligible


Negligible Negligible


Negligible


Impact Significance


Negligible Negligible


Negligible Negligible


Negligible


Chapter 26 Noise and Vibration Page 42


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58