CS6 – Bullenhall Farm( also R9); and CS7 – Burstall Hall.
91.
Further measurements were taken on 29th to the 31stMay 2012 at locations representing residential receptors nearest to HDD and Construction Consolidation Sites along the onshore cable route (Table 26.15).
92. 93.
The weather during all survey dates was considered suitable for noise measurements.
Figure 26.2 shows the location of the receptors in relation to the onshore cable route and convertor station.
Environmental Baseline
Onshore Cable Route 94.
The Onshore Cable Route largely runs through rural areas. Table 26.15 presents a description of the noise environment associated with each receptor location. Identification numbers are associated with HDD and CCS numbers above. Figure 26.2 shows the onshore cable route with monitoring locations. Due to the geographical extent of the route, receptors are not individually specified for individual construction scenarios in the impact section of this chapter.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 26 Noise and Vibration Page 27
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58