Table 26.29 Summary of Projects considered for the CIA in Relation to noise and vibration Project
Status
Development period
East Anglia ONE Application 2018 –2019
1Distance from EA THREE site (km)
0 Project definition
Project data status
Offshore Windfarm Project
Project description available
East Anglia FOUR
Sizewell C Pre-application 2021 –2022 0
Offshore Windfarm Project
Outline project data only
Pre-application Unknown 24.7
Nuclear Power Station
No project detail available
Bramford- Twinstead
SITA (EfW plant)
Pre-application Unknown In construction
Present – late 2014
Potentially 0
0.5 Low Outline only
Energy From Waste Plant
Project description available
Complete / high
No No
Detail unknown, may affect land around the converter station location.
Would be operational before construction commences. No overlap with landfall, onshore cable route or converter station location
1 Shortest distance between the considered project and EA THREE– unless specified otherwise.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 26 Noise and Vibration Page 45
Low No
Incomplete / low
Yes
Complete / high
Included in CIA
Yes
Rationale
Construction would not overlap but consecutive disturbance possible. Operational impacts considered.
Construction would not overlap but consecutive disturbance possible. Operational impacts considered.
No, given distance separation.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58