MET MASTS


REDUCE YOUR CAPEX LEASE YOUR DATA


With met mast systems becoming more complex and more expensive to purchase and maintain, surely it makes sense to remove the Capex costs and the maintenance responsibilities altogether?


After all, you are just interested in receiving reliable and accurate bankable grade data, right?


TEMPORARY MET MAST (TMM) TMM systems are installed to provide wind developers and financiers with Wind Recourse Assessment (data) over a short time frame, typically 12 – 24 months. During that time the structure and the instrumentation installation is subjected to harsh environmental conditions; that is the idea after all…but what happens when there is a vital instrument failure?


• Who is responsible for managing the repair process?


• Why is this process so time consuming for your team?


MONITORING SYSTEM – COSTLY AND TIME CONSUMING


Typically, the client’s System Monitoring Team will spot and report the problem to the Project Manager. The Project Manager may then contact their Wind Analysis Consultants for advice.


They, in turn will investigate the problem and offer suggestions for remedial actions. The client then contacts the installer to agree rectification. The installer dispatches a team to rectify the problem(s) and forwards a report to the client.


The client sends the report to the Wind Analysis Consultants who check the system and update their report for the system. This may be repeated during the lifecycle of the system installation and can multiply across several installations for a large developer.


This of course is very costly and time consuming as typically any warranty will cover the instruments only and not the labour and the technicians.


OPERATING LEASE PLAN – A BETTER WAY?


Surely there is a better way. Wouldn’t it be better to lease the system and the necessary ongoing maintenance under an Operating Lease Plan?


This provides the opportunity to roll all the necessary design, installation, data delivery, monitoring, ongoing maintenance, insurance, de-commissioning and reporting into a simple monthly payment plan. The responsibility to provide reliable, accurate data and reporting throughout the measurement period is transferred from the purchaser to the supplier.


MORE EXPENSIVE


But this will be more expensive in the long term, right? Wrong.


For a typical installed and maintained system such as an 80m — 100m lattice met mast with a full suite of Class 1 instruments, the lease plan is cheaper over the full term.


The reason is that the supplier owns the asset which can be re-used several times. The installer owns the asset — the client owns the data.


Michael Martyn CEO KONA


www.windenergynetwork.co.uk


55


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92