This page contains a Flash digital edition of a book.
MOST SUSTAINABLE PUBLIC SECTOR ORGANISATION – EDUCATION


HIGHLY COMMENDED Leeds Metropolitan University


THE INITIATIVE Carnegie Village: 479 bed halls of residence, located in a conservation area with grade II listed buildings, occupied September 2009. Partners: UPP, Leeds Met, Shepperd Construction. The Rose Bowl: For the Faculty of Business and Law, 12,000 m2


• Rainwater


harvesting and solar thermal hot water


• Landscaping and biodiversity project


in the centre


of Leeds behind the Civic Hall, occupied in April 2009. The brief: To implement our Sustainable Construction and Sustainability Policies, establish costs and data to inform future policies/decisions and evaluate real life experiences of sustainable living/working. Sustainable initiatives include:


Carnegie Village: • 2 townhouses certified to Passivhaus (£37,000 investment first certified building in the UK).


• BREEAM excellent achieved • High levels of insulation and airtightness


• Mechanical Heat Recovery Ventilation System


• Low Nox, A-rated gas condensing boilers


• Low water use aerated taps and showers


• ‘A’ rated Green Guide materials • Full, low energy lighting/passive infrared (PIR) to common areas


• WRAP assessment 16.5% recycled content. Original target of 10%.


• 5,000 tonnes of demolition waste reused on site


Utilisation Oct 09 – Mar 10 kWh/m2 kWh/m2


townhouses passivhaus (Nidd 1&2) kWh/student townhouses kWh/student passivhaus (Nidd 1&2)


Comparative data other halls Oct 09-Mar 10


Kirkstall Brewery (kWh/m2 Sugarwell Court (kWh/m2


) )


Emissions Oct 09 – Mar 10 kgCO2 kgCO2 kgCO2 kgCO2 kgCO2 kgCO2


/m2 /m2 /m2 /m2


townhouses


passivhaus (Nidd 1&2) Kirkstall Brewery Sugarwell Court


/student townhouses /student passivhaus (Nidd 1&2)


Gas 78 36


1,850 800


Gas n/a n/a


Gas 16 7


n/a* n/a* 378 163


*No gas on site. Heating and hot water all electric


connecting and increasing woodland


• FSC certified timber


• £30,000 spend on cycle storage


Rose Bowl: • BREEAM Excellent achieved • Value engineering linked to BREEAM scoring


• 21% reduction in faculty space with approximate saving of 2,000m2 costs


• Whole Life Costing embedded • 10-15 year project payback accepted


• Rainwater harvesting (£41,000 investment)


• Combined Heat and Power (£81,000 investment)


• Daylight and PIR detection in all light fittings


• Energy efficient mechanical ventilation with active chilled beams


• WRAP assessment 18% recycled content. Original target of 10%


Electricity 31 41


728 900


Electricity 105 129


Electricity Total 17 22 57 71


33 29 57 71


398 492


776 655


Fig 1 on build and revenue


• £150,000 on cycle stands, showers, lockers and drying room


• Small wildflower meadow in the car park


• Designed to maximise natural lighting in internal office and teaching spaces


ENVIRONMENTAL AND SOCIAL BENEFITS Carnegie Village Passivhaus (Nidd 1 & 2) • Reduced utility costs for all townhouses and overall carbon savings


• Further reduction in gas costs and carbon savings for the Passivhaus


• Fig 1 highlights the importance of gas to reduce the overall carbon footprint


• Environmental benefits of wood and modular construction.


• Wood being the most sustainable construction material


• Modular construction reducing waste at source


• Dimensioning accommodates standard building material sizes:


• Reducing waste at source • Shorter construction times resulting in less transportation of goods and staff


• Simple plan configuration: • Reduces waste, • Airtightness targets easier to achieve


• Efficient space heating by eliminating cold and hot spots.


• Students first hand experience of living and working in a sustainable building


Rose Bowl • Significantly lower energy use than predicted


SUSTAINABLE FM AWARDS 2010 |33


Carnegie Village


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58
Produced with Yudu - www.yudu.com