search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
FIRE SUPPRESSION


Required by the Environment Agency to produce a Fire Prevention Plan?


FIRE Prevention Plan specialists AC Environmental have over 15 years of project management experience in the waste management, energy and environmental industries.


The Stoke-on-Trent company have noticed within the past decade, the number of either man-made or natural fi res has remained stable. However, waste site fi res have risen along with the impact on nearby residents and businesses.


Concerns over the number and scale of fi res have led to changes to Environmental Permits, which require operators to produce a Fire Prevention Plan (FPP). However Dave Alcock, Director at AC Environmental, said: “AC Environmental Consulting Ltd specialise in producing FPPs.


“Our background is the hands on operation of waste facilities of all types, meaning we bring a practical approach to a problem and can negotiate solutions with the Environment Agency which will not harm your business.”


Larger, high risk sites, and sites applying for new or varied Environmental Permits now have to produce FPPs, designed to minimise the risk of fi re and to mitigate the eff ects.


Good news for all you would think, but the implementation has been problematic, with a number of revisions to offi cial guidance and also the Environment Agency assessment process.


Formerly, FPPs were assessed by a specialist Fire Prevention team, but this was disbanded and they are now assessed by agency offi cers in the regions.


The often rigid approach to guidance can result in requirements for signifi cant changes to site operations and site infrastructure.


This means FPPs are diffi cult to agree, lengthy, and time consuming. An FPP may mean added costs.


ACEnvironmental Consulting DO YOU NEED?


• A Fire prevention plan? • Planning permission? • Environmental permit? • Well, we can help!


Contact us now! T: 01782 349308


E: david@ac-environmental.co.uk www.ac-environmental.co.uk


34 SHM November, 2017


7.5 TONE MERCEDES ATEGO SKIP LOADER


Hyva 7.5 t equipment


Full merc service history Owned from new £10,000 PLUS VAT


DAF SKIP LOADER 57 REG


Immaculate condition Any trial or inspection


£15,000 PLUS VAT We have the above for sale. Any trial or inspection welcome.


All machines have been maintained to the highest of standard by our in house work shops as well as main agents. All prices plus VAT.


Pool Road Industrial Estate, Nuneaton, Warwickshire, CV10 9AE T: 024 7635 1111; 07976 798294 | E: enquiry@crownwaste.co.uk


www.crownwaste.co.uk www.skiphiremagazine.co.uk


We have clients facing a bill of over £200,000 for changes to site infrastructure, and a small end-of-life vehicle site being required to install concrete surfacing and concrete perimeter walls, both of which would have resulted in fi nancial ruin for the operator – these issues are common place.


If a company is asked to produce a FPP, it would be advisable to consider letting a consultant assist A FPP is not just a piece of paper, it is equally as important as a permit and, if not approached correctly, the FPP can easily become too onerous and damaging to a business.


www.ac-environmental.co.uk CROWN


SKIP HIRE = WASTE MANAGEMENT TRANSFER STATION = RECYCLING


7.5 TONE MERCEDES ATEGO SKIP LOADER : 57 REG Full main dealer history Owned from new £12,000 PLUS VAT


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68