This page contains a Flash digital edition of a book.
TATA STEEL


NEW OFFSHORE PROCESSING CENTRE WILL HELP REDUCE RENEWABLE ENERGY COSTS


Tata Steel inaugurated it’s new £2 million offshore processing centre (OPC) at an event recently in Hartlepool, attended by more than 40 leading business figures from the European renewable energy sector.


producer Eisenbau Krämer (EBK) to complement its own product portfolio, creating what is believed to be the most comprehensive and cost-competitive package in this market across a full size range of tubulars.


ENERGI COAST Joanne Leng, Deputy Chair of Energi Coast, the representative group for North East England’s offshore renewables sector, said: “I am delighted that Tata Steel is investing


HARTLEPOOL COLLEGE PRESENTATION Following a presentation at Hartlepool College of Further Education, guests were shown round the company’s new centre, a high-productivity processing facility that will produce welded tubular assemblies to be used in the fabrication of jacket foundations for offshore wind turbines.


They also visited Tata Steel’s 42-inch tube mill, one of three tube mills located at the company’s Hartlepool site.


OFFSHORE WIND SECTOR The OPC will play a pivotal role in supplying the renewables sector, manufacturing highly refined components for the offshore wind sector that can be prepared for welding onto finished structures, thereby shortening throughput times and improving cost efficiency for customers.


Once manufactured, the components will be stored for shipment in kit form to fabricators in the UK and mainland Europe, using local deepwater ports and the UK rail network.


SUPPLY AGREEMENT Tata Steel has also forged a supply agreement with German steel tube


Under the supply agreement, tubes from 400mm diameter upwards will be produced by both companies from plate manufactured by Tata Steel’s plants in England and Scotland.


In addition to tubulars for jacket foundation structures, Tata Steel will also supply smaller sized tubes and sections suitable for all primary and secondary steel work within wind turbine fabrications.


INVESTMENT Deirdre Fox, Sales & Marketing Director for Energy & Power at Tata Steel, said: “The creation of a strong renewable energy industry is dependent upon delivering efficient, cost-effective supply chains.


“The investment in our new offshore processing centre is a key part of our drive to meet this challenge and offer the products and services the industry needs to meet the growing renewables requirement.


“We are committed to establishing a significant presence as a supplier to the renewables sector as the drive in the EU to transform the energy supply scene gathers pace.”


in improving supply chains for offshore wind, as this in turn will undoubtedly lead to future business opportunities for other regional businesses.


“It is also a further sign that the North East of England is well positioned to service the North Sea and European offshore wind farm developments for the future.”


Jacket foundation structures anchor wind turbines to the seabed with piles at the base of each leg. Jacket constructions are particularly suited to the development of offshore wind farms located in deeper waters.


TATA Steel www.tatasteel.com e = See enhanced entry online Energi Coast www.energicoast.co.uk = See video library online


www.windenergynetwork.co.uk


79


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108