COMPANY PROFILE


SHERINGHAM SHOAL OFFSHORE WIND FARM


THE FUTURE


The Company has an option for a further 8 vessels from Mercurio and hopes to take delivery of the next 3 during the coming 12 months with the rest to follow in 2013/14.


The Sheringham Shoal Offshore Wind Farm is the third major offshore wind energy project to be supported by Tidal Transit vessels. Immediately after her arrival in the UK from Spanish ship builder, Mercurio Plastics, Eden Rose went into operation for RES Offshore in Grimsby, servicing meteorological masts 60 miles out into the North Sea, whilst Ginny Louise is currently contracted to the SSE and RWE npower renewables partnership; this partnership is developing the 140-turbine Greater Gabbard Offshore Wind Farm off the Suffolk coast.


STATE-OF-THE- ART VESSELS Both vessels are state-of-the-art, high-specification, purpose-designed vessels for use by companies involved in the planning, development and construction of offshore wind farms in the


Greater Wash and southern North Sea.


Einar Stromsvåg, General Manager of Scira Offshore Energy, said: “Here


As a well-capitalised company they strive to excel in their operations by having the right boats that are managed and operated by experienced crews. The Company has achieved ISO 9001 and OHSAS 18001 accreditation and its vessels were finalists in the EEEGR Innovations awards. Both Adam and Leo are in the EDP Future 50 businesses and entrepreneurs to watch in 2011/2012.


TIDAL TRANSIT’S VESSELS LEAD THE WAY IN NORTH SEA OFFSHORE WIND From May 2012, Scira Offshore Energy, the company developing the Sheringham Shoal Offshore Wind Farm [88 turbines between 9-17 miles off the coast of North Norfolk,] is chartering Eden Rose, one of Tidal Transit’s innovative wind farm personnel and equipment transfer boats, to service the site development.


at Scira, we are very pleased to welcome such a high speccification vessel to our fleet, and are delighted that we can source this vessel from a local company. Tidal Transit is a fantastic example of a Norfolk based company which has positioned itself as part of the supply chain for the developing wind industry in this region.”


Tidal Transit Commercial Director Leo Hambro is delighted with the company’s progress since the first vessel, Ginny Louise, arrived in the UK in late December last year, saying: “There are currently some 4,000 offshore wind turbines in the early stages of the survey and EIA process, waiting for planning consent or actually under construction in the Greater Wash and the southern North Sea. This is creating a strong demand for our no-compromise workboats which are specifically designed to serve the needs of the North Sea wind energy industry. These are greatly superior to the current fleet being used for the same purpose around the UK.”


Leo added: “The Sheringham Shoal development is widely seen as a ‘pathfinder project’ and we are delighted to now be working with the team at Scira Offshore Energy.”


Tidal Transit www.tidal-transit.com


Scira Offshore Energy www.scira.co.uk RES Offshore


www.res-group.com


Ed’s note – Grimsby Renewable Partnership held a celebration event in Grimsby which was jointly sponsored by Port of Grimsby East and RES and included viewing the Eden Rose, launched in April 2012. The event included GRP members, local authority members, LEP members and MPs.


We will be featuring the event and the Tidal Transfer/RES working relationship in forthcoming editions.


www.windenergynetwork.co.uk


85


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148