This page contains a Flash digital edition of a book.
SPONSORS OF INDUSTRY NEWS


organisations, understanding what members want and showing how we can grow together.”


Mr Gray, 53, and his wife Lorraine, Managing Director of a hairdressing business, live at Worstead. They have one grown-up son.


AN EXPERIENCED BUSINESS BACKGROUND


Alan Barlow, EEEGR chairman, said: “We’re delighted to appoint Simon who brings a successful track record in both membership organisations and private sector industries. We believe he will bring the right leadership to grow EEEGR and further develop a coordinated energy supply chain in this region to ensure members benefit most from the multi-billion pound opportunities within the all-energy sector on our doorstep.”


EEEGR www.eeegr.com e = See enhanced entry online


Demonstration Scheme. The scheme aims to support innovative companies to develop and demonstrate novel technologies that will lead to cost reduction in offshore wind energy, and increase deployment levels by 2020, and in the following decade.


Dr Trapp concluded: “There is a clear need to reduce costs and increase safety in offshore wind. We are delighted with the award of funding from the Offshore Wind Development and Demonstration scheme, which recognises both the innovative abilities of OP, and the need to develop access technology to meet the accessibility challenges that will be faced in future projects. NE England has vital strengths in offshore wind technology, and this funding will strengthen our ability to bring this exciting product to market and accelerate the development of MaXccess HBS in preparation for the coming construction, and operation, of Round 3 in the UK, and projects across the world.”


OSBIT Power www.osbitpower.com


KINGSPAN WIND TURBINES FIGHT FUEL POVERTY IN WESTRAY


As part of a £150k investment to help eradicate fuel poverty amongst local residents, energy cooperative Care4Energy has installed five high yield Kingspan Wind turbines on the island of Westray, Orkney.


ORKNEY BUSINESS RING - RENEWABLES


The new croft of 6KW Kingspan wind turbines were installed at neighbouring sites Breckowall and Quality Street by local cooperative Orkney Business Ring – Renewables. They are designed to produce more than 85,000kWh of renewable energy each year, which is being fed back into the grid to generate a new income stream from Feed-In Tariff (FiT) payments as well as an Export tariff for surplus electricity sold back to the grid.


Erik Firth, Manager at Orkney Business Ring adds: “Being a community cooperative ourselves, we were particularly excited to be working with Care4Energy on such a worthwhile project. This is the first stand-alone wind croft Orkney has ever seen and our team of accredited installers did a fantastic job in installing all five turbines within a week despite working in extremely wet and windy conditions. Our experts are now on hand to provide professional, fast response, local support when needed, so we can ensure continued optimum performance and a reliable income stream from the turbines.”


WIND TURBINE DESIGN


Aimed at rural domestic, small holdings and agricultural applications, the MCS certified Kingspan Wind KW6 turbines offer maximum energy capture due to their patented blade hinge design. The turbines’ blades pitch and cone to provide a unique over-speed protection system, eliminating the need for brakes and ensuring uninterrupted operation even in the strongest winds. With a downwind, self-regulating design, the turbines automatically track the wind


ANNUAL INCOME


The new wind turbines are creating a net annual income of around £25k, which is going straight towards helping the fuel poor on the island of Westray, funding a variety of energy saving and renewable energy measures for local residents’ homes, such as insulation, renewable heating and even energy surveys.


CARE4ENERGY


Comments engineer Colin Risbridger of Care4Energy: “We’re delighted that we’ve been able to find a novel and positive way to use the high winds we experience in the area for the good of others. Kingspan Wind turbines were the perfect choice for this particular project. They have a strong, reliable track record and deliver maximum results even in fierce wind conditions. In fact, the turbines are out-performing all expectations already. We were also particularly impressed with the ease of maintenance, and being on a remote island we can rest assured that we have a reliable, first class support service on the island from the team at the Orkney Business Ring.”


direction so there is no need for an active yaw control. Designed to class 1 with survival wind speeds of 54-70 m/s, they also provide a Reference Annual Energy (RAE) of 8,949 kWh at 5m/s (annual mean wind speed) and a five year product warranty as standard.


COLLABORATION


Local community organisation Energy Action Westray secured funding from Leader, The Energy Saving Trust and Energy Efficiency Design Awards to set up energy cooperative Care4Energy. The aim was not only to find a solution to relieve fuel poverty on Westray island, but to contribute to its ambition of providing 100 percent of its energy requirements from Renewables by 2012. Kingspan Wind turbines were specified based on the leading MCS approved energy yield figures for the high wind speeds at the two sites matched with the first rate, guaranteed service provided by the local professional team Orkney Business Ring Renewables.


Kingspan Renewables www.kingspan-renewables.co.uk www.windenergynetwork.co.uk 11


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148