THE MAGAZINE FOR THE DRAINAGE, WATER & WASTEWATER INDUSTRIES
MAIN FEATURE
light curing unit, and no additional liners have to be provided. Thismeans that the outstanding properties of the
BRAWOLINER®, such as its extreme bend flexibility, can also be utilised.
ranges DN 125 to DN 300. Froma pipe diameter of DN 150 upwards, pipeswith bends can also be rehabilitated economically and efficiently. A high level of installation safety aswell as the usual high quality of BRAWO® Tech, the brand for high- quality rehabilitation equipment, is guaranteed. The combination of BRAWO®Magnavity and BRAWOLINER® is ideally suited to the difficult construction sites involving property drainage: the BRAWOLINER® can be used togetherwith the
Further to these developments, Brawo Systems has also recently introduced the new BRAWOLINER 3D DN 200-300,which now optimally complements the ever-popular 3D liner product range. Thismeans that all nominal diameters fromDN 50 to DN 400 can be served, evenwhen there are dimensional changes in the pipe run. The BRAWOLINER 3D DN 200-300 is compatiblewith the Brawo I, Brawo III and BRAWO LR resin systems. Curing can be carried out as usualwith steam, hotwater, light or ambient temperature.
In addition, BRAWOLINER 3D DN 200 to 300 fulfils the requirements ofmaterial characteristic group 2 (EP resin, DWA data sheetM_144-3) and is
therefore suitable for the rehabilitation of pipes with old pipe condition II. The newBRAWOLINER will be available fromBRAWO SYSTEMS fromMay 2021 in the familiar unit lengths of 25m, 50m and 100m.
PBFDrainage – Bluelight is claimed to be the most developed systemavailablewith over 12 years of experience and that it is the only pure LED light cure equipment compared to the other systemswhich are UV LED. PBF Drainage (PBF) has been the UK agent for Bluelight since 2018 when it purchasedwhatwas believed to the first LED light curing equipment in the UK. Not long after the company set up its agency agreement with Bluelight gmbh.
This agreement enabled PBF to distribute the equipmentwithin the UK. Initially being the only user in the UK, it enabled PBF Drainage to get used toworkingwith the equipment as an installer, it also allowed the company to be prepared for newclient involvement. PBF could explain the uses, the actual feel of the equipment andmaterials and any issues that UK clientsmay
FOLLOW US
June 2021 |
9
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84