THE MAGAZINE FOR THE DRAINAGE, WATER & WASTEWATER INDUSTRIES
PRODUCT NEWS
BRAWOLaunchDay
BRAWOMagnavity
property drainage: the BRAWOLINER® can be used togetherwith the light curing unit, and no additional liners have to be provided. Thismeans that the outstanding properties of the BRAWOLINER®, such as its extreme bend flexibility, can also be utilised.
BRAWOLINER® 3D – the only linerwith DIBt approvals for all curingmethods - also for curingwith LED and UV light
InMay 2019, BRAWO® SYSTEMS became the first 3D liner to receive a generally valid building authority approval fromthe DIBt (German Institute for Building Technology) for curingwith LED and UV light.With the approval, all systems offered by BRAWO® SYSTEMS – including light curing – have been tested and approved by the DIBt and their high quality and safe use have been verified.
The BRAWOLINER® is a seamless textile hose with seamless filmcoating. Due to a special
FOLLOW US
loop construction, all BRAWOLINER® hoses are extremely flexible,making themthe ideal rehabilitation solution for defective pipeswith dimensional changes and bends of up to 90°. Due to the special loop construction, the liner adapts optimally and almost crease-free to the course of the pipe. The liner can be used for all curing methods: customers do not need to stock different liners, and only the light-curing BRAWO® LR resin is required as a supplement.
BRAWOMagnavity – Smart - Efficient - Powerful
These three attributes stand for the innovative BRAWO®Magnavity system, whichmakes light curing even smarter, more efficient andmore powerful. The systemconsists of a choice of two intelligent LED heads, a 50-mlong combination hosewith integrated energy
BRAWOMagnavity LED
and compressed air supply, a retraction unit and a control box.
The innovative, unique design of the LED head allows it to be retracted simultaneouslywith the inversion of the liner. Curing is thus carried out immediately after installation of the liner,without the need for additional insertion of the eel.
In thisway, a completework step is saved, and evenwith long pipes and ducts, one access point (e.g. inspection opening) is sufficient for the rehabilitation.
June 2021 | 59
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84