CASE STUDIES
Germany to the UK - No problem! A post-Brexit, trans-Europe, supply chain success story
By LeonWoods, Amiblu
Structural Rehabilitation, Gipsy Patch Lane, Bristol PROJECT PARAMETERS
Country / City UK, Bristol
Year of Construction 2021 Installation Time 4weeks Application Sewer Rehabilitaion Intallation Trenchless Technology Technology Hobas
Total Length of Pipe 280m
Nominal Diameter DN (mm) DN800 Nominal Pressure PN (bar) PN1
Nominal Stiffness SN (N/mm²) 32,000 Client South Gloucester Council
Contractor Matt Durbin Associates Ltd Consulting Engineer South Glos Council
Gipsy Patch Lane, Bristol is amain road forming part of a newCribbs Patchway Metrobus route in South Gloucestershire. As part of an asset assesment programme a fewyears ago, a CCTV survey showedmany defects throughout the length of the surfacewater culvert at Gipsy Patch Lane. The defective sections ran under the busy carriageway so, as an interimmaintenance measure the local authority excavated a section of the road and installed a concrete slab over the pipe to protect it fromfurther deterioration or collapse.
24
During heavy rainfall over the summer of 2020, the same pipewas found to have suffered structural defects and root ingress through open joints and connecting laterals resulting in localised blockages of up to 90%. A newman-entry survey showed the pipe beneath the concrete slab to be deformed.
Majorworkswere already underway in the area to replace a railway bridge on Gipsy Patch Lane, so South Gloucestershire Council took the opportunity tomake improvements to the sewer in conjunctionwith the Network
| June 2021 |
www.draintraderltd.com
Railworks tominimise disruption,whichwas further aided by lighter traffic due to the regulations set in place for Covid-19 pandemic.
Under the Council’s Climate Resilient Scheme, the taskwas to find and deliver a suitable solution before opening the road up to traffic and risking a pipe collapse; two optionswere considered; open-cut to replace the section of pipe or trenchless technology to reline the affected pipewith little disruption to the area.
DougMacKay, Projectmanager, South Gloucestershire Council consultedwith Julian Britton, Critical SewersManager,Wessex Water andMatt Durbin Associates; specialist confined space and GRP structural relining installer to determine themost efficient and economic technique. Aswithmany suburban roads, Gipsy Patch Lane is ladenwithmany serviceswithin the carriageway, so rehabiliatation of the existing pipeline through trenchless installation of 210mx DN800 structural GRP jacking pipe supplied by Amibluwas decided upon. As the contract was classed as emergencyworks, subject to time constraints and speed of execution the use of Amiblu’s GRP pipesmeant thatMDA
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84