This page contains a Flash digital edition of a book.
SPONSORS OF INDUSTRY NEWS


TIDAL TRANSIT INTRODUCES ‘GINNY LOUISE’ TO NORFOLK


The first of a possible fleet of up to ten state-of-the-art, purpose designed support vessels to transport personnel involved in the planning, development and construction of offshore wind farms in the Greater Wash and southern North Sea arrived in Harwich recently from its Spanish boat builder.


she goes on to Wells-next-the-Sea and Grimsby for further customer trials.


SPECIFICATION Ginny Louise’s specification greatly exceeds the current fleet being used for the same purpose in the UK. The vessel’s MCA Cat 1 coding and 10,000 litre fuel tanks give it a range of up to 150 miles offshore, well within the range of the UK’s forthcoming Round 3 wind farms. She provides four crew members and twelve passengers with comfortable beds, kitchen, bathroom, internet and entertainment facilities, enabling wind farm engineers to live and work on-site for up several days at a time.


The vessel boasts rugged GRP construction that allows her to operate in rough seas – a major advantage


Its owners, Tidal Transit, will now sail Ginny Louise round the coast and moor at Great Yarmouth to provide an early opportunity for potential customers and the media to see over the vessel before


THE CROWN ESTATE APPOINTS HUUB DEN ROOIJEN TO LEAD OFFSHORE WIND TEAM


The Crown Estate has announced the appointment of Huub den Rooijen as its first Head of Offshore Wind Energy. Huub will take up the post in the spring of 2012. He has played a major role in some of the biggest offshore wind projects in Europe and advised many of the industry’s leading companies.


EXPERIENCE Huub is a Director of Project Management Support Services Ltd, where he has advised clients in the UK, Europe and Asia. He is currently working with Ventolines B.V., a Dutch developer, where as Project Director of the Westermeerwind project he is leading the delivery of Europe’s first inland lake-based wind farm. Earlier in his career Huub led the successful delivery of the first offshore wind farm in Dutch waters, and was responsible for the delivery of Blyth offshore wind farm, the first in the North Sea.


when working in the North Sea. She is also fitted with twin V12 MAN engines that allows her to achieve 27 knots when carrying twelve passengers plus crew, and up to 6 tonnes of on-board cargo.


Massive cargo decks fore and aft can accommodate up to 10,000kg of tools, equipment and spares, and the Guerra crane on the aft deck with a lifting capacity of 1,025kg at 6.9m caters for long reach loading and unloading. The crane can also be deployed for camera surveys and grab sampling.


Leo Hambro, Tidal Transit’s Commercial Director, is enthusiastic about the vessel’s arrival, saying: “The arrival of the Ginny Louise presents us with an exciting opportunity to introduce a very different vessel to the UK’s offshore wind farm developers and operators. When the next vessel Eden Rose arrrives early in 2012, we will undertake a tour of all the major east coast ports to showcase the advantages of these sensational vessels. With the UK constructing ever larger offshore wind farms to help meet the world’s need for clean energy, I believe that our vessels will quickly become the preferred form of transport for wind farm crews.”


Tidal Transit Limited www.tidal-transit.com


REMIT


Huub will lead the delivery of The Crown Estate’s offshore wind programmes around the UK, including its Round 3 programme which is set to deliver a quarter of the UK’s electricity needs by 2020. The Crown Estate plays a central role in facilitating the expansion of offshore wind electricity generation, which has the potential to generate thousands of jobs in the UK.


strong team of renewable energy experts, and we are delighted to have attracted someone with his experience and expertise. His appointment as a dedicated Head of Offshore Wind Energy is testament to our long-term commitment to driving the offshore wind industry forward.”


On his new appointment, Huub den Rooijen, said: “To work for The Crown Estate is an exciting opportunity for me – it is an organisation which in a relatively short period of time has enabled the UK to become a renewable energy industry world leader. I look forward to seizing the opportunity to lead a dedicated offshore wind team at the heart of the industry, to further cement the organisation’s track record of facilitating renewable energy development.”


The Crown Estate www.thecrownestate.co.uk


In welcoming the appointment, Rob Hastings, The Crown Estate’s Director of the Marine Estate, said: “Huub is a tremendous addition to our already


www.windenergynetwork.co.uk 07


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148