This page contains a Flash digital edition of a book.
Adding timetable and train order control to the C&W: Pt. I


train superiority, signals, train orders and clearances, etc. For all intent and model rail purposes, CPR’s rulebook is the same as the general UCOR used throughout North


America so I


wouldn’t need operators to learn a dif- ferent code, and the important rules from it had already been summarized, thank goodness! Next up was the information that CPR provided in their employee time- table No. 91 in effect October 11th, 1970 to be exact. This prototype booklet pro- vides timetables for scheduled trains on


Westbound work extra 8608 exits Shed No. 1 deep in McRae Canyon high in the Monashee Mountains (left). Here are the instructions for the Boundary way freight east train (below). The intent of this tri-fold pamphlet is to provide everything the engi- neer should know about the specifics of the job. This sides focuses on purpose and industries along the route. Side two (page 45) of the train instruction has any specific instructions and consolidated wisdom and hints. It also has a place for engineers to record switch list info should they choose.


Industry & Siding Key Route Schematic


Columbia & Western RR


Train Number: X_____________East Train Name: Boundary Freight East


Role: wayfreight for all Boundary Sub stations and spurs between Midway and Castlegar


Power: 4 axle units, min 1500 hp per 5 LD cars or 8 MT cars over Farron summit


Maximumtrain length: 24x50’ equivalent cars – [Ltd by Farron Siding]


Notes: Daily – Run Extra ----


Originates Grand Forks [West end staging track 1. Use mirrors over Cascade to see train]


---- Will likely meet Boundary Freight West 81 between Castlegar and Cascade


---- ----


May meet Phoenix Ore Train West 89 between Farron and Castlegar


Register train at Castlegar/South Slocan


---- Will likely meet Kraft Switcher at Castlegar


----


Terminates Nelson [Register on arrival]


Boundary Freight East rev 22, September 1st, 2013 44 FEBRUARY 2014


Castlegar [ GG ] [17 car capacity] [ CGY2 ] Lift chip cars for Grand Forks/Midway


Shields [ SH ] [21 car capacity] [SHMOW] MOW spur


Coykendahl [KD] [25 car capacity]


Farron [ FA] [24 car capacity [FALOG] Log reload [FAHSE] House Track [FAMOW] MOW spur


Lafferty/Fife [FI] [19 car capacity] [FIFIL]


Gravel fill spur


[FICON] [FISAN]


Consolidated Mining Limestone tipple Sandner Bros lumber reload


Cascade [C] [25 car capacity] [


[CPOT] [CHSE] [CORE]


[CMOW] MOW spur


Note: drop any cars for BN []to house track [CHSE] for West bound 81


] Carson spur BN interchange Potato Warehouse House track Ore reload


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100