This page contains a Flash digital edition of a book.
ADVERTISEMENT FEATURE


International upgrades for Riversmeet Leisure Trust and David Lloyd Leisure


Gerflor’s leading the way in flooring – as an innovator, not an imitator


ers by installing internationally approved badminton surfaces from Gerflor. However, the improvements [both refur- bishments] were poles apart with regards to project execution. In 2008, Dorset District Council agreed


R


to release the balance of £4m to the Three Rivers Partnership, which had been set aside to refurbish and remodel the Riversmeet Leisure Centre. The building had been closed for many years and the scope of the project involved a com- plete refurbishment, in order to provide a fitness suite, a heated pool, a café and four-court sports hall for local users. The main hall floor was made up of old


Granwood tiles; one court had actually fully deteriorated and had to be completely re- moved. The Gerflor solution was to prepare and level the existing floor and install a new TaraflexTM


onto the existing surface. On top of this, a Dry-Tex fast track method of installation was added, which is fully guaranteed to be laid directly onto Granwood-type composite tiles. The whole work was com- pleted over a period of four days, saving both money and time, as well as reducing


iversmeet Leisure Centre in Gillingham Dorset and the Da- vid Lloyd Leisure in Derby have both delighted their custom-


the risk of environmental impact, as the existing floor was left in situ. John Havill, chair of the Three Rivers


Partnership commented “When I think how bad the floor looked before and how it looks now it’s quite remarkable. Gerflor assisted in the entire project management of the scheme and the sports hall floor refurbishment came in on time and on budget.” Havill says the customers love it. “In particular the bad- minton club users, some even hinting that this is the best sports floor that t hey have ever played on.” David Lloyd Leisure in Derby, a premium


Sport M+ sports floor directly


health and racquets operator, wanted to improve its badminton facilities for strategic reasons. The facility boasts excel- lent academies in both squash and tennis but badminton was being played at a recreational level on a tennis carpet. The operator was determined to change this and so sports manager Gavin Bailey be- gan sourcing a new surface while he also implemented the Badminton All Stars pro- gramme. This is aimed at children aged six- to 12 years and offers a progressive coaching plan in place, as well as drills and fun games. The club opted for a TaraflexTM


Com-


bisport 28. This is a low profile under carriage system with TaraflexTM


Sport Riversmeet’s sports flooring, before and after refurbishment


David Lloyd Leisure in Derby opted for a TaraflexTM


Combispor t 28


M+ laid on top. It provides high levels of force reduction and excellent freedom of foot movement. Combined systems of this nature are widely regarded as the best sports flooring on the market for user safety, comfort and sporting performance. Bailey said: “David Lloyd Leisure aims


to deliver products and services in line with high consumer expectations. The use of TaraflexTM


sports flooring in our


badminton hall helps to meet and exceed this expectation by giving our customers a quality sporting experience. Feedback from our members about the surface has been superb and we are wit- nessing many newcomers to badminton, which has not been seen before.” TaraflexTM


floorin g i s approve d b y th e


World Badminton Federation and Bad- minton England national governing body. It can be used for both permanent and temporary installations. There are also a number of fast track


overlay options for refurbishment projects. A surface treatment called Pro- tecsol®


, patented exclusively by Gerflor,


is applied at the manufacturing stage – this provides easy maintenance, with no sanding and no polishes required for the entire life of the product and with no un- expected inrease in operational costs. For further information on Gerflor’s latest innovations, specifications or project advice, contact Darren Wood at Gerflor on +44 (0)1926 622 600 or +44 (0)7836 366579, email contractuk@ger- flor.com or visit www.gerflor.co.uk


enquiry no. 524


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76