| scotland
THE GARMENT FACTORY IN GLASGOW ACHIEVES PRACTICAL COMPLETION T
he Garment Factory, a unique and contemporary office development in
Glasgow’s city centre, has achieved practical completion following an extensive refurbishment project undertaken by Castleforge Partners. A category ‘B’ listed building located at the corner of Ingram Street and Montrose Street in the Merchant City Central Conservation Area, the Garment Factory is one of Glasgow’s most notable buildings. It provides 47,382 sq.ft of high quality retail and design-focused office space over
seven floors. The £6million refurbishment project,
undertaken by a team which includes lead contractor ISG, project manager PMP and architect Morgan McDonnell Architecture Ltd, involved combining the restoration of the original features, including exposed ceilings, steel and brickwork, wooden flooring and ornate staircases, with the introduction of contemporary finishes throughout to provide a 21st century workplace. An impressive over-sized entrance
lobby/reception with two new high-speed lifts,
Fully Insured Removals and Storage Nationwide
www.clockworkremovals.co.uk
on-site café and breakout space has been created on Montrose Street to serve the office floors above. Two new retail/restaurant units on Montrose Street and Ingram Street have been formed and offer quirky features including covered outdoor dining areas and a triple level spiral staircase, which is attracting interest from leisure operators and boutique breweries. The basement area has shower and changing facilities as well as lockers and a cycle storage area, event space, games room and communal kitchen with LED lighting throughout. Works on the open plan office space over the upper six floors included a full overhaul of the suites with the introduction of new finishes in keeping with the building’s listed status. The existing stairwells have been retained and refurbished and the building’s mechanical and electrical services have been replaced and upgraded.
The exterior of the red sandstone building has also been conserved and the roof has been extensively overhauled.
Rachael Pittaway from Castleforge
At Clockw
Moving Needs
For All YoAll Your
Yo
t Clockwork w e off
Glasgow - 0141 956 7111
Edinburgh - 0131 669 0044
Clockw 52
Clockwork Accredit ed:
www.clockworkr
www.clockworkremovals.co.uk e offer FREE estimat es, so contact us now with no obligation ac t us no w with no oblig ation
Perth - 01738 633 080
Inverness - 01463 237 774
Partners said: “It’s great news that we can announce we’ve achieved practical completion at the Garment Factory; it really is a beautiful building in a great location and we’re very proud of the finished result. We wanted to restore the building’s original industrial aesthetic and emphasise the warehouse/factory origins by making features of the cast iron columns and leaving services exposed to allow the original fabric of the building to shine.”
Architectural practice Threesixty Architecture and digital services provider Incremental Group were confirmed as the first occupiers for The Garment Factory earlier this year. Threesixty Architecture has taken the entire top floor, comprising 8,374 sq.ft of space, and Incremental Group will occupy the whole of the fifth floor, extending to 8,353 sq.ft.
Both firms are currently undertaking
fit-out works ahead of taking occupation early next year. The Garment Factory is a historic and well-known building in Glasgow. Built in 1898 to the designs of prolific Glasgow architect James Thomson, it was originally the garment factory of J & W Campbell.
COMMERCIAL PROPERTY MONTHLY 2018
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100