Safety in the Plant
Risk of electrostatic ignition during powder processing operations
Pneumatic conveying systems have the ability to generate vast quantities of electrostatic charge via the movement of product through the plant equipment. The most common method of electrostatic charging on such process operations is due to tribo-electrification, which is simply the contact and separation of the powder with the walls of the processing equipment, the powder molecules itself or other factors that can cause charging, like surface contaminants.
In this incident a process operator working on a pneumatic conveying system heard a crackling noise when powdered material was being transported between the classifier and the loading hopper. During investigation of the noise, the operator came into contact with a section of the duct and received a significant static shock. Although the operator was unharmed, the severity of the incident warranted a full system shutdown to investigate how static charges had been able to accumulate on a particular section of ducting.
During the inspection the duct was examined and it was identified that the section of duct was not suitably grounded. When tested it was found the duct had a resistance path back to ground well in excess of 1011
Ω, exceeding the
recommended resistance of less than 10 Ω for metal plant items in good contact with ground, stated in IEC 60079-32-1:2013 Explosive atmospheres Part 32-1: Electrostatic hazards, guidance.
Further inspection found that the unusually high resistance was a result of a single grounding clip that had not been properly installed after a clean down operation. Consequently, the piping between the two ducts acted as an isolated conductor resulting in the generation and subsequent accumulation of charge. The lack of continuity to ground meant that the charge could not be dissipated, allowing an excessively high voltage potential to develop on the duct which eventually discharged onto the operator. Given the high rate of charge generation and spark discharge by a poorly fitted grounding clip; a review of grounding and bonding of all metallic parts was carried out. The inspection scrutinised the grounding and bonding integrity of all equipment units, all sections of ducts, bags and cages in the bag filters. As a result many deficiencies were found and swiftly rectified.
MARCH/APRIL 2018
The nature of a powder processing operation means that the generation of static electricity is to be expected in all parts of the system because of the movement of the particles through equipment. Therefore, regular maintenance is required to stop material from clogging up the machinery. Regular disassembly for cleaning and maintenance can result in bonding connections being missed or not made correctly when the equipment is reassembled. Vibration and corrosion may also degrade assembly connections so it is imperative to ensure that no parts in the assembly become isolated from a true earth ground.
Fortunately in this particular scenario, a larger scale incident was avoided by the luck of an operator. If the isolated ducting had not been found the outcome could have been very different. A static discharge in the right place through a combustible atmosphere along any section of ducting could have resulted in a significant ignition incident, putting the lives of employees and plant assets at risk.
The most effective way of ensuring complex equipment used in powder processing operations cannot accumulate static electricity is to provide a dedicated static grounding solution that is capable of monitoring the ground connection to components at risk of isolation. Such a solution should also be able to prevent the flow of product and alert personnel to a potential hazard should a component lose its connection to ground. This is especially important if the ground connection point to the equipment is not readily visible or isn’t easily accessible for example, the grounding clips mentioned in this scenario.
What actions could have been taken to prevent this incident? It is highly plausible that charge accumulation on an isolated ducting section had resulted from a misplaced grounding clip multiple times during previous operations without a visible electrostatic ignition incident ever occurring. Without a flammable/ combustible atmosphere being present in the spark gap when such a discharge occurs, frequent discharges could have regularly gone unnoticed. This is a common feature of process operations that have suffered from the consequences of a fire or explosion caused by static electricity.
www.reviewonline.uk.com
The first place to start is to determine why electrostatic charge was “permitted” to accumulate on the section of ducting. In this case electrostatic charge had been allowed to accumulate because the loss of continuity resulted in the section being electrically isolated from the general mass of ground. Had the section been connected to a true ground, charge would not have been accumulated on its surface. Instead excess electrostatic charges would simply have found their way to ground. So in accordance with industry guidelines like NFPA 77 and IEC 60079-32-1, the isolated section (in this case the length of ducting) should have had continuity through to a verified ground with a resistance of 10 Ohms or less.
In this example the system is configured to ground 7 sections of ducting (1 – 7) and a drum (8). Each channel is individually monitored back to ground to a resistance of less than 10 ohms and interlocked with the control equipment responsible for the flow of product. All monitored channels including the drum (1 – 8) need to have a path to ground (via bonding straps or grounding clamp) before the system will go permissive allowing the operation and flow of product to commence.
The Earth-Rite® MULTIPOINT II system solves these problems by ensuring that all parts of the equipment have continuity through to ground with a resistance connection of less than 10 Ohms. The reliance on human intervention to perform regular resistance checks is alleviated due to the monitoring and interlocking capabilities of the Earth-Rite
33
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48