search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
NEWS


Condair opens new Hamburg factory


G


lobal humidifier specialist, Condair, has recently opened its newly built


production, logistics and sales facility i n Hamburg, Germany, marking a milestone in the company’s development.


The 13,000m 2 building centralises Condair’s European manufacturing operations. Situated next to Hamburg a irport, the new Condair facility is also close to the motorway and harbour.


Oliver Zimmermann, Condair’s chief executive, explained:


“Norderstedt in Hamburg offered us t he perfect logistical location. Placing o ur production facility close to our core central European markets, with such convenient transport links, shortens our delivery channels and results in quicker delivery times.


The consolidation of four different E uropean production centres i nto a new high-tech facility not o nly makes Condair more


s treamlined and cost-effective but also enables us to improve our processes and quality.


“The excellent opportunities offered by the new location are essential for the far-reaching


r estructuring of the company and it is with great pride that we open this new chapter in the Condair success story.”


Central to the design of the Condair building was a focus on e nergy saving technology, and being a world leading humidification specialist, maintaining a healthy indoor climate of 40%-60% relative humidity at 22°C-26°C, was of utmost importance.


Güntner installs new measurement laboratory


G


üntner has established a new measu rement laboratory, based at the company’s


headquarters in Fürstenfeldbruck in Ba varia, Germany.


What makes the new system so special is that it not only measures the volume of CO


2 and NH 3 , but it


can also take capacity and air volume measu rements. In addition to this, the system will soon enable sound measu rements to be carried out. The chamber design is closely based on the requirements of EN 327/328, and provides reliable capacity measu rements for a wide range of thermal boundary conditions. The design of the measu ring system also allows frosting and defrosting tests to be performed. Measu rements are


carried out on CO


condensers as well as CO evaporators.


2 gas coolers and 2 and NH3


This year, capacity measu rements will ha ve priority at the new laboratory. At the beginning of 2018, the details on the design and dimensioning of the air-measuring section will be determined.


For air measu rements, the test item is connected via an opening at the ceiling to a duct system installed above the chamber.


The air volume can reach a


maximum of 30,000m3 /hou r. From 2018 onwards, it will also be possible to measure sound.


The measu rements of the CO 2 units are to be carried out in


preparation for the extension of the Eu rovent certification to these units.


www.acr-news.com 9 Kelvion


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76