This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Table 3: Seasonal restriction for mitigation and pre-construction surveys for East Anglia ONE (Onshore Cable Route and Converter Station). (Grey represents when surveys may be carried out, blue indicates when exclusion / habitat modification mitigation would be carried out and pink shown periods when non-invasive mitigation would deployed)
Outline Landscape and Ecological Management Strategy. Version 2