1.7 During Construction - Disturbance Avoidance and Management 1.7.1 Embedded mitigation


35. The construction operation has a range of measures already embedded within its operational procedures to avoid significant disturbance to breeding and non-breeding birds that have been outlined above. This includes the requirement to follow the CoCP and the employment of an ECoW.


36. Additional detail on these measures relevant to the construction phase are:


At all HDD sites measures will be applied, with appropriate monitoring, to ensure that noise occurring on areas used by concentrations of Brent Goose and Avocet and nesting Schedule 1 birds is kept below 70 dBAmax.


At the HDD operational sites constructing the crossings of the Deben Estuary and the Martlesham Creek measures will be applied, with appropriate monitoring, to ensure that that artificial illumination of areas used by concentrations of Brent Goose and Avocet is kept below 1 lux.


At the HDD operational sites constructing the crossings of the Deben Estuary and the Martlesham Creek onsite visual barriers will be erected around the works area to minimise visual disturbance.


At the Deben Estuary HDD crossing site where concentrations of Avocets are known to feed in the intertidal area close by, but shielded by the tidal embankment, all construction workers will be given strict instructions not to leave the HDD site and walk up on to the sea wall. This will avoid construction workers ‘skylining’ on the sea wall and disturbing the Avocet.


37. The ECoW will be supported by a suitably licenced ornithologist in those circumstances where an active nest of a Schedule 1 species has to be approached closely in order to assess the stage of nesting activity.


1.7.2 Species specific application of avoidance and management measures Brent Goose


38. The ECoW will monitor the distribution of feeding Brent Geese in the intertidal areas around the HDD crossing points and on the agricultural land adjacent to the Deben Estuary. This will be to ensure that the measures described in this EcMP are implemented and are effective.


39. The ECoW will monitor the cropping pattern of the fields on the agricultural land adjacent to the Deben Estuary in order to determine whether or not the farmers have sown crops


EcMP: Deben Estuary SPA & Schedule 1 Birds Page 8


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129