This page contains a Flash digital edition of a book.
28.3 Scope


28.3.1 Study Area 6.


The Study Area has been identified using the East Anglia THREE site and offshore cable corridor, the onshore electrical transmission works and accesses, to define the search areas for socio-economic data for the proposed East Anglia THREE project.


7. The socio-economic study areas are as follows: 


Onshore construction: Drive time catchments of 30 and 45-minutes from Woodbridge (taken as the centre point of the cable route) (Figure 28.1) have been used to provide a locational assessment of onshore construction workers. This is also used to inform Chapter 27 Traffic and Transport.





Offshore construction: the socio-economic assessment will be primarily based on a 90-minute drive time catchment from relevant ports (please see Figures 28.2, 28.3 and 28.4). Sub-area catchments of 30, 45 and 60-minute will provide further context for the assessment and are used to identify potential capacity constraints.


8.


The tourism study area consists of a broad coastal strip (c.10km) from Winterton-on Sea in the north to Walton-on-the-Naze in the south (Figures 28.5 and 28.6). This area covers the main tourism receptors with potential to experience visual effects from the proposed East Anglia THREE project during the construction and decommissioning phases of the project. An additional study area covers a broad corridor (2.5km either side of the onshore cable route from the landfall location to the proposed onshore converter station location (Figures 28.6, 28.7, 28.8 and 28.9). This area is where the majority of potential temporary construction and decommissioning impacts would be anticipated, centred on the alignment of the onshore cable route.


28.3.2 Worst Case 9.


28.3.2.1 Onshore 10.


Socio-economic and tourism and recreation impacts associated with the proposed project are considered at an onshore and offshore level:


There are two scenarios for the installation of onshore cables for the proposed East Anglia THREE project:


 Scenario 1: use of pre-installed ducts; or


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 28 Socio-economics Page 7


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47