Consultee
Planning Inspectorate
Date / Document
Scoping Opinion / November 2012
Comment
Consideration should be given to any gas and electricity pipelines buried onshore and the potential restrictions this may place on the location of the onshore cables. Please see National Grid’s comments (Appendix 2 of this Opinion) for further information.
Planning Inspectorate
Scoping Opinion / November 2012
The Planning Inspectorate advises that this section should consider the interrelationship with ecology, in particular the impacts from the removal of grassland, trees and hedgerows ecological habitats. Appropriate reference should also be made to the socio- economic assessment in the ES.
6.
Response / where addressed in the PEI
Utilities are considered in section 22.5, 22.6 and 22.7
An updated utilities data search will be undertaken in summer 2014 and will be included in the final ES and DCO application.
Reference to ecology and consideration of ecological habitats is given in section 22.6.
Reference is made to Chapter 28 Socio Economics as appropriate in this chapter.
22.2.1 Statement of Common Ground for East Anglia ONE In addition to the consultation undertaken and detailed above, a Statement of
Common Ground (SoCG) was produced for East Anglia ONE in July 2013 for electromagnetic fields and health impacts, and Public Rights of Way (PRoW). Consultees included Suffolk County Council, Mid-Suffolk District Council, Suffolk Coastal District Council, Natural England, East Suffolk Internal Drainage Board, and Suffolk Wildlife Trust. The next sections outline the matters agreed in the SoCG. Further details for the SoCG are provided in Appendix 23.1.
7. The matters agreed in the SoGC are outlined below, and are relevant to East Anglia
THREE as the projects follow the same route. These matters have been considered during the assessment process within this chapter:
The parties agreed with the results of the assessment of impacts in relation to electromagnetic field impacts fromEast Anglia ONE, as outlined in ES Volume 3, Chapter 23.
The parties agreed that adherence to the requirements within the DCO (Version dated 12th July 2013), and the commitments to be contained within the Outline CoCP for East Anglia ONE, would ensure the avoidance of health related impacts from land contamination.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 22 Land Use Page 3
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75