Impact
Soil heating Restrictions on land use practices
Secondary impacts Impact on land drainage systems
Decommissioning All impacts
Key design parameters forming realistic worst case scenario
Scenario 1 and 2  Maximumno. of HVDC cables = 4
Scenario 1 and 2
 Maximum total operational land take = 2.61ha (at converter station location)
 Maximumtrench depth = 1.5m x 32.17km length.
 Both scenarios o Buried cable system: Cables de-energised and left in situ;
o Jointing pits left in situ; o Converter station removed and components reused and land returned to initial state; and
o Landscaping and reinstatement of the site.
Maximum values provided within Chapter 5 Description of the Development.
Rationale
Maximum values provided within Chapter 5 Description of the Development.
Maximum values provided within Chapter 5 Description of the Development.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 22 Land Use Page 10
      
      
      
Page 1  |  
Page 2  |  
Page 3  |  
Page 4  |  
Page 5  |  
Page 6  |  
Page 7  |  
Page 8  |  
Page 9  |  
Page 10  |  
Page 11  |  
Page 12  |  
Page 13  |  
Page 14  |  
Page 15  |  
Page 16  |  
Page 17  |  
Page 18  |  
Page 19  |  
Page 20  |  
Page 21  |  
Page 22  |  
Page 23  |  
Page 24  |  
Page 25  |  
Page 26  |  
Page 27  |  
Page 28  |  
Page 29  |  
Page 30  |  
Page 31  |  
Page 32  |  
Page 33  |  
Page 34  |  
Page 35  |  
Page 36  |  
Page 37  |  
Page 38  |  
Page 39  |  
Page 40  |  
Page 41  |  
Page 42  |  
Page 43  |  
Page 44  |  
Page 45  |  
Page 46  |  
Page 47  |  
Page 48  |  
Page 49  |  
Page 50  |  
Page 51  |  
Page 52  |  
Page 53  |  
Page 54  |  
Page 55  |  
Page 56  |  
Page 57  |  
Page 58  |  
Page 59  |  
Page 60  |  
Page 61  |  
Page 62  |  
Page 63  |  
Page 64  |  
Page 65  |  
Page 66  |  
Page 67  |  
Page 68  |  
Page 69  |  
Page 70  |  
Page 71  |  
Page 72  |  
Page 73  |  
Page 74  |  
Page 75