MSDC (MSDC undated; SCDC 2014). The onshore cable route crosses 23 of these boundaries and the converter station would be located in the Bramford parish.


 Local planning authority boundary: This is the study area for indirect impacts and provides the second point on the scale to put impacts into the district context. This incorporates the entire district boroughs ofMSDC and SCDC. This has been selected as this is the spatial level at which local plan policy is made and development objectives applicable as the local planning authority.


 County Boundary: This study area is used to assess indirect impacts and provides the third point on the scale to put impacts into the county context of Suffolk. The onshore cable route and converter station are wholly within the county of Suffolk.


9. Detailed engineering design, route refinement, and additional information was


sought for the onshore cable route, Construction Consolidation Sites (CCS) and associated temporary works (area / access roads) during the Environmental Impact Assessment (EIA) undertaken for East Anglia ONE. This assessment draws primarily on the information provided within the ES for East Anglia ONE as the landfall and onshore cable route are shared (See Chapter 5 Description of the Project). The ES for East Anglia ONE also identified the converter station locations for the East Anglia ONE, East Anglia THREE and East Anglia FOUR projects.


10. This chapter considers potential impacts of the onshore electrical transmission works


(including access) of the proposed East Anglia THREE project in relation to:  Agricultural Land Classification (ALC);  Agri-environment schemes;


 Notifiable scheduled diseases and injurious weeds and invasive plant species (i.e. certain highly contagious animal diseases such as anthrax, foot and mouth disease and the presence of Japanese knotweed or giant hogweed etc.);


 Existing land uses, including PRoW and open access;  Existing utilities;  Planning designations from the relevant local development plans;  Land sterilisation;


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 22 Land Use Page 5


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75