22 LAND USE


22.1 Introduction This chapter considers the potential impacts of the proposed East Anglia THREE


1.


project on land use. The chapter provides an overview of the existing land use located where the onshore electrical transmission works are proposed, followed by an assessment of the potential impacts of two methods for construction, operation and decommissioning of the onshore cable and associated infrastructure for East Anglia THREE. The assessment considers cumulative impacts of existing and proposed projects. Further information regarding the approach taken towards impact assessment is discussed in Chapter 6 Environmental Impact Assessment Methodology. This chapter has been prepared by Royal HaskoningDHV.


2. Figures which complement the text in this chapter are provided in Volume 2 Figures


22.1. This chapter is supported by Appendix 22.1 Consultation for East Anglia ONE, and Appendix 22.2 Land Use Tables.


3. 4. National Policy Statement (NPS) guidance in relation to land use is discussed in


section 22.4.1. It should be noted that the project also has the potential to impact land uses


discussed in other chapters within the Preliminary Environmental Information Report (PEIR). These are covered as follows and referenced, within this chapter, where relevant:


 Chapter 19 Soils, Geology and Ground Conditions;


 Chapter 23 Ecology – covering nature conservation sites and land with ecological interest;


 Chapter 27 Traffic and Transport - covering roads and access; and  Chapter 28 Socio-economics.


22.2 Consultation Consultation undertaken to date is provided in Table 22.1. The consultation includes


5.


responses from consultees in relation to the East Anglia ONE Offshore Windfarm Scoping Report (RSK 2011) and quoted as per the East Anglia ONE Environmental Statement (ES) (RSK 2013). Appendix 22.1 details the East Anglia ONE PEIR consultation (RSK 2012a) and Phase 2 Consultation (RSK 2012b), which are also


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 22 Land Use Page 1


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75