LIGHTING SPECIFIED


PANTRY: Lighting Services Inc pendant-mounted line voltage track, Philips Alkco surface-mounted lensed linear fluorescent T5 undercabinet light, LBL Lighting pendant-mounted low voltage track COPY ROOM: Philips Alkco: Surface-mounted lensed linear fluorescent T5 undercabinet fixtures, Axis Lighting pen- dant-mounted lensed linear fluorescent T5 downlights


OPEN OFFICE: Delray Lighting low-profile linear fluorescent pendants, Osram Sylvania Seamless linear fluorescent T5 lamps for Delray pendants, Philips Color Kinetics LED nodes, Lighting Services Inc monopoint and track-mounted adjustable Ceramic Metal Halide T4 trackheads and current limiting devices


CONFERENCE ROOMS & EVP OFFICE: Focal Point: Recessed lensed linear fluorescent T5 downlights, Elliptipar pen- dant-mounted adjustable linear fluorescent T5 wall washers, Cooper Lighting Iris recessed adjustable halogen MR16 downlights, Lutron Electronics motorised shades and shade control devices RECEPTION: Traxon colour-changing LED nodes arrayed behind diffusing panel, Lighting Services Inc pendant-mount- ed line voltage track with adjustable Ceramic Metal Halide T4 trackheads, Birchwood Lighting surface-mounted diagonally staggered linear fluorescent T5 strip lights within custom painted light box behind IALD logo cutout, Cooper Lighting IO LED surface-mounted linear LED accent light within reception desk, Bartco Lighting surface-mounted linear fluorescent T5 strip lights to uplight ceiling from architectural clouds ELECTRICAL ROOM: Cooper Lighting Metalux pendant-mounted linear fluorescent T5 downlight COAT CLOSET: Bartco Lighting surface-mounted lensed linear fluorescent T5 strip light


Top (l to r) During mid-day hours, panels lit by LED nodes are predominantly amber to mimic warm afternoon sun; at dusk, panels slowly cross-fade to blue animations to encourage alertness before employees head home; after dark, panels change back to amber animations to sustain circadian rhythms. A preset control system provides flexibility and automatic shut-off. Left Eight feet long pendants utilise T5 Seamless lamps, opal acrylic lenses, and integral, step-dim ballasts. Ballasts are wired to only drive lamps at 50% output to meet energy code and light level requirements. Far left Despite a sparse budget and six month design/construction schedule, the IALD’s new offices are dynamic. The design incorporates simple, clean forms and white surfaces to reflect light. The reception area features the logo and monitors displaying projects. A framing projector softly illuminates the IALD logo. The ‘passage’ logo is backlit.


east-facing windows. The space was large enough to accommodate their current staff of seven people, but also gives them the ability to eventually expand up to eleven employees. Further, the new space provides ample space for storage, meetings and a kitchen.


Schuler Shook collaborated closely with the IALD and Perkins + Will, the architect selected for the renovation. One of the team’s primary design goals was to demon- strate the power of light to transform - a principle of the IALD. Walls, suspended ceil- ings and surfaces are all white in order to


DEUTSCH


Das Design von Schuler Shook für die Büroräume der International Association of Lighting Design- ers (IALD) in Chicago integriert eine hohes Level an Energieeffizienz. Vorrangig werden Lichtquellen mit hohem Wirkungsgrad wie Kompaktleuchtenlampen, Metalldampflampen und LED benutzt. Eines der wesentlichen Designziele des Teams war die Demon- stration der Kraft des zu transformierenden Lichts – ein Grundsatz der IALD. Wände, Zwischendecken und Flächen sind alle weiß, um neutrale spiegelnde Oberflächen zu präsentieren. Die Beleuchtungskörper werden sorgfältig in die Architektur einbezogen. Die IALD war auf eine minimalistische, reine und zeitlose Beleuchtung bedacht. Große leuchtende Wandplatten wurden montiert und so programmiert, dass sie im Laufe des Tages langsam die Farbe wechseln, um die Büroangestellten positiv zu beeinflussen. Die IALD verfügte über ein sehr niedriges Budget für die Renovierungsarbeiten, deswegen sah sich das Designteam der Herausforderung gegenüber, ein- fache, kostengünstige Materialien auf kreative Weise


present neutral reflecting surfaces. Lighting fixtures are carefully integrated within the architecture. The IALD was keen to have lighting that is minimal, clean and timeless. Large, glowing wall panels were installed and programmed to slowly change colour throughout the day to positively influence the IALD staff working in the office. The IALD had a very small renovation budget, so the design team was challenged to utilise simple, inexpensive materials in creative ways. Further, the design and construction schedule was only six months. Despite the budget and time constraints,


zu verwenden. Darüber hinaus war das Design- und Bauprogramm auf nur sechs Monate begrenzt. Trotz der Zwänge in Bezug auf Budget und Zeit sollte das Team ein einzigartiges, elegantes Design entwickeln. Die Beleuchtung für den neuen Firmensitz von IALD erreicht die Ziele des Projekts und ist geradlinig und zeitlos, ohne kommerziell zu wirken.


ITALIANO


La progettazione della Schuler Shook per gli uffici di Chicago della IALD (Associazione Internazionale dei Progettisti d’Illuminazione) contiene un alto livello di rendimento energetico per mezzo dell’utilizzo predom- inante di fonti di luce ad alta efficacia quali quella fluorescente, l’alogenuro metallico e il LED. Il gruppo di disegnatori aveva fra i propri scopi progettuali quello di dimostrare la capacità di trasformazione della luce, un principio base della IALD. Muri, soffit- ti sospesi e superfici sono tutte realizzate in bianco proprio per presentare superfici a riflessione neutra. Le installazioni d’illuminazione sono attentamente integrate all’interno dell’architettura. La IALD era propensa ad avere un’illuminazione che fosse min-


the team was committed to developing a unique, elegant design.


The lighting for the new IALD Headquarters achieves the project goal of being straight- forward and timeless without being cor- porate. It is a demonstrated, creative and positive example of The Power of Light. www.schulershook.com www.iald.org


If you would like to learn more about the benefits of joining the IALD then go to www.iald.org


imale, pulita e atemporale. Vasti pannelli murali luminescenti sono stati installati e programmati allo scopo di cambiare lentamente colore durante le ore del giorno con lo scopo di donare un’influenza pos- itiva al personale della IALD impegnato negli uffici. La IALD aveva un budget di ristrutturazione molto limitato, dunque la squadra progetti si è cimentata nello sforzo di utilizzare in modo creativo materiali semplici ed economici. Inoltre, i tempi di progettazi- one e realizzazione del progetto erano ristretti nello spazio di sei mesi. Nonostante le limitazioni di spesa e di tempo, la squadra aveva preso l’impegno di svi- luppare un progetto elegante ed unico nel suo genere. L’illuminazione della nuova sede centrale della IALD ha raggiunto la mèta progettuale di essere semplice e atemporale senza però essere aziendale.


ESPAÑOL


El diseño de Schuler Shook para las oficinas de la Asociación Internacional de Diseñadores de Ilumi- nación (IALD), en Chicago, incorpora un alto nivel de rendimiento eléctrico, utilizando principalmente fuentes de energía de alto rendimiento, como fluo-


rescentes, haluros metálicos y LEDs. Uno de los obje- tivos de diseño principales del equipo era demostrar el poder de la luz para transformarse, un principio de la IALD. Todas las paredes, los techos suspen- didos y las superficies son blancas para presentar superficies reflejantes neutrales. Los dispositivos de iluminación están cuidadosamente integrados dentro de la arquitectura. La IALD deseaba contar con una iluminación minimalista, limpia e intemporal. Se instalaron grandes paneles brillantes, programados para cambiar de color lentamente a lo largo del día para influir positivamente en el personal de la IALD que trabaja en la oficina.


La IALD disponía de un presupuesto de renovación muy bajo, por lo que el equipo de diseño tuvo el desafío de utilizar materiales sencillos y baratos de forma creativa. Además, el programa de diseño y construcción sólo abarcaba seis meses. A pesar de las restricciones de presupuesto y de tiempo, el equi- po estaba comprometido para desarrollar un diseño único y elegante.


La iluminación de la nueva sede de la IALD logra el objetivo del proyecto de ser directa e intemporal sin ser corporativa.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174