This page contains a Flash digital edition of a book.
070


PUBLIC REALM PROJECTS / ARNHEM CENTRAL, ARNHEM, NETHERLANDS


Pic: UNStudio © Ronald Tilleman


necessitated the fabrication of special fixtures that would bridge the points where some of the prefab roof sections meet. Approximately 170 special pieces with lengths of between 310 -1700mm, were created for this job. Together with the 750 standard units, the Abri luminaires provide 1.3km of light.


ERCO Lightcast downlights, coated to match the colour of the ceiling panels, provide additional illumination over the stairways to the footbridge and tunnel. 20W, 1650 lumen and directional 70W, 6600 lumen versions were used respectively. The resulting space feels brighter, cleaner and less cluttered, helping to ensure com- muter satisfaction remains high as the station’s capacity continues to grow. www.unstudio.com


Pic: SORBA © Jan Maarten Lieverdink


Pic: SORBA © Jan Maarten Lieverdink


PROJECT DETAILS


Arnhem Central, Arnhem, Netherlands Client: ProRail, Utrecht Engineering: Movares


Contractor: BAM-Dura Vermeer Contractor installations: SPIE


Architect: UNStudio (Ben van Berkel with Arjan Dingsté and Marc Hoppermann, Marc Herschel, Derrick Diporedjo, Kristin Sandner, Rein Werkhoven)


LIGHTING SPECIFIED


ERCO Lightcast 1 x HIT-TC-CE 20W downlight ERCO Lightcast Directional 1 x HIT-CE 70W downlight 920 x vanDoorn ABRI recessed strip light


Pic: UNStudio © Ronald Tilleman


DEUTSCH


Der Bahnhof Arnheim verbindet zahlreiche regio- nale Strecken mit internationalen Hochgeschwin- digkeitsdiensten nach Deutschland. In Erwartung zunehmender Benutzer wurde der Bahnhof kürzlich komplett modernisiert. Dazu gehörte die Einfüh- rung eines neuen Dachsystems auf allen Bahnstei- gen mit einer integrierten Fußgängerbrücke, die sie mit dem Nordeingang des Bahnhofs verbinden. UNStudio entwickelte ein Beleuchtungssystem, das in die Dächerstruktur eingebaut wurde. Die Hauptbeleuchtung stammt von zwei durchgezo- genen Linien, die über die gesamte Bahnsteiglän- ge verlaufen, doch erwies sich die Suche nach passenden Beleuchtungen als schwierig aufgrund der strengen Bestimmungen für Beleuchtungen im Schienennetzwerk. Keine der zugelassenen Leuchten hatten einen geeigneten ästhetischen Stil, so dass UNStudio sich an VanDoorn Verlicht- ing wandte, um die besagte Einheit zu kreieren.


Die Bahnsteigdächer wurden außerhalb des Stan- dortes in einer Länge von circa 25 m vorgefertigt und die Beleuchtung vor der Lieferung nach Arn- heim installiert. Die kundenspezifische Neonbe- leuchtung setzt sich bis in die Fußgängerbrücke fort, die zusätzlich durch Erco Scheinwerferzeilen beleuchtet wird.


ITALIANO


La Stazione Centrale Arnhem collega svariate destinazioni regionali con servizi internazionali ad alta velocità verso la Germania. Con l’intenzione di accrescere il numero dei passeggeri, la stazione è stata di recente sottoposta ad un miglioramento significativo, che ha visto l’introduzione di un nuovo sistema di tetti presente su ogni binario , integrato con una passerella pedonale che unisce i binari l’uno all’altro fino all’ingresso nord della stazione. UNstudio ha sviluppato un progetto di il- luminazione integrato nella struttura dei soffitti. L’illuminazione principale viene da due linee con-


tinue che corrono lungo tutta la lunghezza dei bi- nari, nonostante sia stato difficile trovare dei dis- positivi idonei a causa dei regolamenti molto rigidi in materia di illuminazione sulle linee ferroviarie. Dal momento che nessuno dei dispositivi approvati sembrava avesse uno stile estetico adeguato, UN- studio si è rivolto a VanDoorn Verlichting alla fine di creare una struttura personalizzata. Le coperture dei binari sono stati prefabbricati fuori sede e avendo una lunghezza di 25 metri, l’illuminazione è stata installata prima della consegna ad Arnhem. La striscia di illuminazione personalizzata continua sulla passerella pedonale, che riceve una illuminazione aggiuntiva da riflet- tori Erco.


ESPAÑOL


La estación Central Arnhem conecta varias rutas regionales con servicios de alta velocidad interna- cionales a Alemania. Anticipándose al aumento de pasajeros, la estación finalizó recientemente una


gran mejora, que fue testigo de la incorporación de un nuevo sistema de techos en todas las platafor- mas, integrados con un puente peatonal que une a todos ellos con la entrada norte de la estación. UNStudio desarrolló un proyecto de iluminación que fue integrado en la estructura de los techos. La iluminación principal viene de dos líneas con- tinuas que corren a lo largo de las plataformas. Encontrar artefactos adecuados fue difícil dadas las estrictas reglamentaciones en cuanto a ilumi- nación en relación a la red del ferrocarril. Ninguno de los artefactos aprobados contaban con un estilo de estética adecuado, entonces, UNStudio cambió por VanDoorn Verlichting para crear una unidad a medida. Los techos de las plataformas fueron prefabri- cados afuera con un largo de aproximadamente 25 metros, de manera que la iluminación fue in- stalada antes de su envío a Arnhem. La hilera de iluminación a medida continúa en el puente pea- tonal, el cual recibe iluminación adicional desde los focos Erco.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164