This page contains a Flash digital edition of a book.
Holiday wishes for a “normal” 2011 20101112


Global Semiconductor Shipments 3-Month Growth Rates on $ Basis


1.2 1.4 1.6


0.4 0.6 0.8 1


1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 1 5 9 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10


Total $ Shipments from All Countries to an Area SIA website: www.sia-online.org/


Chart 7. 20101112 20101117 Global "Purchasing Managers" Index


32 34 36 38 40 42 44 46 48 50 52 54 56 58


DIFFUSION INDEX 60 50 EXPANSION CONTRACTION 40 30 20 10 0


JPMorgan 1 2 3 4 5 6 7 8 9 101112 1 2 3 4 5 6 7 8 9 101112 1 2 3 4 5 6 7 8 9 101112 1 2 3 4 5 6 7 8 9 1011


07 08 09 10


Global "Electronic Foodchain" Outlook 2011 vs 2010


Combined GDP Electronic Equipment Rigid & Flex PCBs Semiconductors Semi Capital Spending


-2 Chart 9.


and salaried employees in Kentwood, Michigan. Cencorp appointed Henrikki Pantsar as R&D director. Compal Electronics is investing US$500 million to build a laptop facility in Chengdu, China in April 2011. Computrol purchased an Essemtec Tucano in-line screen printer. CTS EMS is adding 30,000 SF in Ayutthaya, Thailand, to expand its value add services, providing complex box build and high level mechanical assembly. Datest installed new dual-sided SPEA 4060 flying probe system in Fremont, California. Dell will close its 750,000 SF facility in Winston-Salem, North Carolina. DSM Computer is expanding its production capacity in Munich, Germany. Elcoteq: • appointed Olli-Pekka Vanhanen VP, business control and accounting, and member of the management team.


Chart 10.


processes outsourcing contract from Sarantel.


Elite ES is moving its U.S. headquarters to 50,000 SF building in the Walter Brown II industrial park and is investing $2.5 million in upgrades. EN ElectronicNetwork Hersfeld GmbH passed ISO/TS 16949 (automotive) and DIN EN ISO 13485 (medical) recertification audits. Enics added 100 temporary workers in Estonia. Èolane acquired 85% of Assiopôle. Express Manufacturing introduced package on package assembly packaging technology that vertically stacks a discrete controller and memory BGA components. Flextronics: • will hire 12,000+ engineering and manufacturing employees for its new Flextronics Computing facility in Wu- zhong, China.


• received assembly, test and supply chain


• Medical opened a dedicated 180,000 SF facility in Senai, Johor, Malaysia.


facility in Delhi, India.


• opened a 1 million SF computing facil- ity in Wuzhong, its fourth in China.


• partnered with ASSET® InterTech to accelerate the adoption of the new


IEEE P1687 Internal JTAG standard.


Foxconn: • spent NT$825 million to acquire 33 million shares in Chi Lin Technology.


• postponed building of a new mobile phone plant in Vietnam until 2011.


• will invest US$261 million to set up two new subsidiaries and add invest- ment in five existing subsidiaries in China.


• will build a $2 billion LCD plant in Chengdu, China.


• had 500 workers in Tamil Nadu ar- rested for attending a strike.


• Global Services opened a 240,000 SF facility in Milan, Italy, and a 20,000 SF


24 – Global SMT & Packaging – Celebrating 10 Years – December 2010


Gargnäs Production Link changed its name to PanLink AB. Hanza recruited Thomas Lindström as sales & marketing manager.


www.globalsmt.net 0 3 Henderson Ventures Henderson Ventures


Custer Consulting Group


SIA 6 6 Gartner 2 4 6 % Change 8 10 10 12 7


3/12 Rate of Change 1


2 3 5 4 7 9 11 12 6 8 10 13


0.5 0.7 0.9 1.1 1.3 1.5


20101112


World Global PMI, Electronic Equipment, PCB & Semiconductor Shipments


3/12 rate of change


Converted @ Constant 2008 Exchange Rates PCB


"0" Growth El Equip Global PMI SIA


3 6 9123 6 9123 6 9123 6 9123 6 9123 6 9123 6 9123 6 9123 6 9123 6 9123 6 9 00


01 02 03 Source: Custer Consulting Group Chart 8. 04 05 06 CALENDAR YEAR 07 08 09 10


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60