President Dave Menzel,


P.E. and Carolos Alvarez, lead a team whose portfolio of achievements include: Indialantic Town Hall; Mercedes Homes; MIMA; Omni Healthcare; Kelley Ford; Cocoa Beach Surf Company; Crane Creek Medical; Marina Tower; and Seaside Centre. There are even distinctive residential homes that enhance the list, making MAI a design/ build company boasting 500 landmark projects in Florida. These projects include commercial, industrial, hospitality, manufacturing, medical, large residential and multi-use.


The Distinctive Edge The brains and brawn


since we provide design and construction to the project.” This streamlined way of


project development, from concept-design-build, with realistic expectations, has been MAI’s best marketing tool.


The MAI Difference


resources together. Single leadership controls costs, quality, scheduling and performance.


UNIFIED CLEAR


TIME


COMMUNICATION: Client focused from the start.


SAVINGS: Seamless single design, builds results in quick bidding process.


communication and cost savings. DOLLAR


behind MAI believe that architects not only build, they must align themselves with the community and address concerns such as the need to preserve the urban heritage, maintain architectural continu- ity and improve the environment. “MAI was established 25 years ago as a full-service design


firm,” says Menzel. “Our projects range in size from small additions to commercial projects that are over 200,000 square feet and in excess of $37 million. So, the old adage, ‘No project too small or too big…’ rings true for MAI.” Doing what a company does best, and doing it extremely


well and extremely fast is something MAI has down to a science. “Our niche is in design-build projects. We can take a concept and provide preliminary drawings of site and buildings very quickly and provide fairly accurate costing for construction in a few days,” says Menzel.


Staying Ahead of the Competition But with many architects vying for the same position,


how does MAI do it? How do they get the big signature projects that are not only functional, they’re traffic- stopping gorgeous? “Being a design/build firm, we can provide initial site and building drawings immediately. This enables us to do budgeting feasibility, and once we proceed we can provide a fixed cost,” he adds. This is “whether it be a commercial building or a large custom home. Our clients do not get change orders in projects that we design and construct. In addition, our fee structure is reduced


SAVINGS: Seamless design- construction means better


RESOURCES: They place both design and construction


The Advantage


of Design/Build The design/build deliv-


ery method differs from the design/bid/build method in several ways. Studies show that the design-build projects end up with up to 90 percent fewer field-generated change orders than design-bid-build projects. In some cases it can practically eliminate them, according to a 2005 Pennsylvania State University study. Change orders represent the


largest source of extra costs in the building/construction


industry. While change orders that are client-driven are expected, those that arise from design errors or lack of coordination are often avoidable. Those field-generated change orders cause prob- lems: changes in work sequence; declines in productivity; increases in overtime; and need for costly reworking. The study showed: 8 Cost growth due to unforeseen change orders was 98 percent lower


8 Average size of all change orders was 50 percent lower 8 Size of unforeseen change orders averaged 77 percent smaller


8 Number of unforeseen change orders was reduced by 90 percent


8 Cost growth due to change orders was 71 percent lower (Source: April 2005, Contracting Business)


Refining the Craft Being good doesn’t necessarily protect businesses from


a downturned market and MAI attests to this. “This slow cycle has provided us the opportunity to sit back and focus on the business and the companies we serve. From this we have established new strategies that are now refined and ready to implement on a larger scale once the economy picks up,” Menzel adds. Solid business practices, a seamless approach, putting the


client first and exceeding expectations all around position MAI Design Build as a keen competitor here and beyond Brevard.u


spacecoastbusiness.com JULY2010[57


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100