New build annex in line with baseline objectives and conservation needs


pupils and operate as an annex to the existing St John’s Green School, expanding its capacity to 540 pupils. Designed by LSI Architects, the building layout is in line with government


T


HE £3.5M new build development at St John’s Green Primary School in Colchester will accommodate 300


characterised by a continuous folding pitched roof and expressed gables, closely following the function and layout of the compact internal design. The project will be constructed using a


steel frame with precast concrete floor planks exposed to the classrooms to improve thermal comfort. Natural daylight


will be utilised alongside intelligent internal lighting. The school will employ passive ventilation using roof-mounted extract vents activated by internal sensors. It will be heated by efficient gas fired boilers and underfloor heating, while a photovoltaic array will contribute to renewable energy demands. Care was taken to ensure that the


annex relates strongly to the surrounding conservation area, as well as incorporating the play areas, landscaping and playing fields central to the brief. The project was developed using BIM and is due for completion in early August 2014.


www.lsiarchitects.co.uk www.farrans.com


Red brick elevations harmonises the building with the adjacent Garrison Conservation Area


recommendations and bears a close resemblance to the EFA Baseline designs, aiming to maximise value for money while meeting stringent brief and area requirements. With Farrans as main contractor, the


development comprises ten classrooms arranged over two storeys, centred around a double height flexible learning area and an assembly hall. The central space forms the heart of the school, while the surrounding classrooms will feature individually coloured window reveals. Throughout the building, the use of internal corridors has been minimised in favour of friendly break-out spaces, allowing for unobtrusive but effective passive supervision. Externally the form is


The annex will help Essex County Council meet demands for new primary school placements


educationdab.co.uk 77


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84