This page contains a Flash digital edition of a book.
Business profile


‘The approach we’ve agreed with TBM means it is able to operate as a self-contained team providing the necessary specialist support and labour to dismantle the toilet cubicle, undertake a heavy clean and take away components for an intensive clean and repairs, all during the first 12 hours of day one of the overhaul programme’


tank fully-licensed by the Environment Agency. This process is then repeated over a two to three hour period to ensure the toilet system is thoroughly cleaned. Said Hawker: ‘This method is proven


to remove even the most stubborn materials, such as limescale, that are the most common cause of clogged pipes, with results so far demonstrating a reduction in on-board blockages by as much as 60 to 70 per cent – unfortunately there isn’t quite a foolproof system that has been developed yet that can cope with some of the more ‘unusual’ man- made blockages. ‘Over the past few years we’ve seen everything from chicken bones, through


Tank, before


Tank, after


to 15 metres of rope and a full diving suit stuffed down train toilets.’


A self-contained team The CET Tank and Pipe Cleaning Machine, and the firm’s wider expertise in servicing and maintaining CET systems, has been proving its worth on a major on-board toilet upgrade currently being carried out by Alstom Transport. Lee Kinsey, commercial and projects


manager for Alstom Transport, explained: ‘TBM Rail Group is a key component of Phase 1 of our Class 390 Pendolino toilet improvement plan being undertaken during the H3 overhaul of the original fleet of 52 Sets. The approach we’ve


agreed with TBM means it is able to operate as a self-contained team providing the necessary specialist support and labour to dismantle the toilet cubicle, undertake a heavy clean and take away components for an intensive clean and repairs, all during the first 12 hours of day one of the overhaul programme. ‘Additionally, TBM Rail Group has


worked closely with us to devise a number of toilet cubicle improvements – using material that TBM Rail is providing. This enables the H3 Project team to concentrate on other aspects of the programme, safe in the knowledge that TBM’s scope is being dealt with in a professional manner. ‘With 38 of the 52 Sets having already


been completed – without incident or problem – we remain confident that together the programme will be completed on-time.’


Flushed with success With TBM Rail Group flushed with success after such a positive reaction to its new CET Tank and Pipe Cleaning Machine, the firm is now pressing ahead with its plan to become the key supply chain partner for the rail industry. January saw the launch of a new joint venture with Danish company Glova Rail, a firm that manufacturers and supplies vacuum toilet systems to a wide range of rail operators across Europe, while a number of exciting product developments are in the pipeline, along with further expansion into servicing other areas of rolling stock. For further information call 0844 800 8577 or Email enquiries@tbmrail.com www.tbmrail.com


May 2013 Page 93


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124