INSIGHT | MUCKING, TRANSPORT, LOGISTICS


tunnels, and can also provide service and emergency support functions during the operational lifetimes of the major underground assets. In urban environments they are sometimes used,


such as the dedicated logistics tunnel and related hub built for construction of the HS2 London Tunnels. On the TELT CO6/7 the logistics tunnel was


Above: One of the many tunnel entrances to the early works for Lyon-Turin tunnel project.


Long tunnels in rural and especially mountainous


regions often have adits at points along the alignments to permit access and execution on defined portions of the tunnels. In effect they are logistics conduits and typically not small endeavours in their own right. They are often used for construction of long transport and hydropower


REFERENCES


● ‘Catelli, E. & Lanfranchi, P. (2026) ‘Spoil management at the second tube of the Gotthard Road Tunnel: Challenging logistics for a sustainable underground construction.’ WTC 2026, Montreal, Canada


● Paulet, S., Guerin, J., Garel, P., Onur, E., Humbert, E. & Schriqui, P. (2026) ‘Challenges and opportunities in sustainable spoil management for the Lyon-Turin project: The example of the French lot.’ WTC 2026.


● Lione, S, Brino, L, Schriqui, P. & Valente, A. (2026). ‘Le lot français de valorisation des déblais du tunnel de base du Mont Cenis, un chantier dans le chantier : mise en route et premiers retours.’ (The French spoil valorisation lot of the Mont Cenis Base Tunnel, a project within the project: commissioning and first feedback). AFTES 2026, Lille, France.


● Bertrand, M., Lecomte, B. & Fontana, A. (2026) ‘Défis logistiques sur le projet TELT (lot 2, CO6/7) : création d’une galerie de connexion et optimisation du démarrage du tunnelier.’ (An additional connection galley for an improved logistic management, TELT project Lot CO6-7). AFTES 2026.


● Ouali, N., Bertrand, M. & Dumoulin, C. (2026) ‘Automatisation du Délai Déterminant : Un atout pour le phasage et la contractualisation d’une modification de projet sur le chantier TELT CO6-7.’ (Automation of the Time Adjustment Mechanism: An asset for construction phasing and contractual management of a project modification on the TELT CO6-7 Worksite). AFTES 2026


● Battistoni, F. (2026) ‘Défis posés par la conception, la fabrication et la logistique de très longues machines dans le cadre du projet du Tunnel Euralpin Lyon Turin.’ (Challenges posed by the design, manufacture and logistics of very long machines as part of the TELT project). AFTES 2026


● Noualhaguet, S., Roude, M. & Vallon, F. (2026) ‘Bouygues et les inter-tubes mécanisés - 10 ans de succès.’ (Bouygues and the Mechanised cross passages – a 10 year success story). AFTES 2026


● Hong, J. Z., Li, Y. & Yuan, J. (2026) ‘Feasibility study of applying autonomous dump truck in cavern project for mucking out: A case study in Hong Kong.’ WTC 2026


● Iwano, K., Aoyagi, T., Yamagishi, T., Mega, T., Inuzuka, T., Tsubokura, S., Egashira, A. & Matsuyama, T. (2026) ‘Development of advanced tunnel shotcreting, mucking and bolting as automated tunnel construction system.’ WTC 2026


introduced to help overcome logistical challenges between the surface and underground via two built access shafts, and was added on a risk-sharing contract agreement at no extra cost to the projects, the paper says. It supports spoil removal, ventilation, pumping, power supply and other utility networks, plus supply of concrete and support structures, worker mobility and improves safety. Related in the logistics re-think for underground there was a shift to the TBM assembly area – which eliminated construction of a cavern of 340m2 cross-section. The outcome was helped in part with a plan for a 90° rotation and slight re-positioning of the TBM. Related is a paper on use of the Time Adjustment


Mechanism for phasing the key works on the lot within the contractual final milestone dates. Ongoing, monitoring tools are to help daily checks of geology versus phasing to recalculate Critical Paths and any adjustments necessary to deadlines as part of risk sharing. In a further paper to AFTES 2026 the question of


logistics was among the challenges listed as part of the project’s construction site CO5, as build choices have led to very long TBM and backup assemblies – 330m and 650m, respectively, the latter for the ‘Wurm’ type. All machines are from Herrenknecht. The build choices to be supported are to construct the concrete base slab and also to concrete each tunnel lining while tunnelling. Complex logistics is a result for the systems, calling for maximum off-site assembly and activities.


Much more AFTES 2026 also heard Bouygues discuss its next applications of the mechanised constriction of cross passages, using short mini-TBMs that are pipejacked between main tubes of transport projects. The approach feeds into construction logistics


and much else. It has been used on the Tuen Mun Chek Lap Kok (TMCLK) and HKT2 projects in Hong Kong, and is planned for use on the Lower Thames Crossing project in the UK and Torrens to Darlington (T2D) project in Australia. Use of steel segments for temporary and permanent support at openings plus complex spoil management are further features of the proposed approaches to the projects. Separately, a WTC 2026 paper considers transport


aspects to some degree in looking at the planning and construction for the River Weser immersed tube tunnel project in Germany. Other aspects of transport on projects were


considered throughout the conferences but mentions of multi-service vehicles (MSVs), backup gantries, wagons, conveyors, lifts and access systems, and more are only made in brief, in various places.


34 | November 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45