TRANSPORT – SINGLE VS TWIN TUNNELS | TECHNICAL


more generally by owners in designing these key nodes in their future infrastructure and operating business asset. When all is said and done though, the in-depth


examination and discussion in Vol 2 then concludes the choice between the alternatives “remains one of the consequential decisions in the planning and design of underground transportation infrastructure… and demonstrates that neither configuration can be universally considered superior.” The key is to consider the specific case, in a universal way. The guidance has much to commend it, not


only for the task undertaken but for being hugely interesting and educational when bringing together so much information. It is a powerful and purposeful briefing, and conveys much about engineering as well as wider project planning.


REPORT STRUCTURE Overview The guidance from WG20 was published in early 2026 in two volumes – Vol 1: Executive Summary; and Vol 2: Factors, Challenges and Opportunities. Together they constitute ITA Report No 42, published in April. With marked difference in purpose they are


therefore quite different in length: the formal at 21 pages in length, the latter at 100 pages. They are very well structured and illustrated, being packed with information in text and photographs in Vol1, and in the larger volume the quantities are much more, added to which are graphics, tables and appendices. As an executive summary, Vol 1 packs in much information succinctly to set the scene, using seven quite short chapters – with lengths from 1 page (or a fraction of such) up to 4 pages. It has 15 figures. With more space to discuss the questions at hand


and to present guidance, the 100-pages of Vol 2 is structured also in seven chapters but does so over 68 pages, preceded by the contents and lists of abbreviations and definitions, and followed by references and two appendices. It has 103 figures.


Chapter focus Within Vol 1 the report sets out its scope then briefly discusses system configurations (rail/metro, road and also evolution of bored tunnel size) before a review of alternatives. Following a very brief discussion on the advantages of the twin tube arrangement, there are a few pages on single-bore tunnels, considering both opportunities and challenges. Continuing into Vol 2 with a similar progression,


while both single and twin arrangements are discussed there is a sense of exploring perhaps more the possibilities for, if not quite an advocacy of, the possibilities afforded by increasingly large single- bore tunnels. One chapter, in fact, is partly named ‘… the large bore opportunity’; and an appendix contains ‘examples of large-diameter tunnel projects.’ With twin tunnels bored by well-established TBM sizes, suited to running single large rail trains or


FACTORS IN REVIEWING ALTERNATIVES


The report, in Chapter 5, says the alternative options of single large-diameter tunnel versus twin tubes should be explored through several factors as follows, each with further aspects to consider, as listed: ● Functional design and operational requirements: owner, operator requirements; design criteria (if transit/rail or road); space-proofing; station integration; fire-life safety; architectural compatibility; compatibility with existing or future infrastructure.


● Cost-Benefit analysis: capex (cost); life-cycle cost; operating revenue; funding; operational stability.


● General design and construction methods: alignment and right-of-way; constructability; structural design; subsurface conditions; TBM technology/ specs; resiliency; sustainability.


● Risk: owner experience & precedence; ground control & settlements; fire-life safety strategies & criteria; system engineering; market risks.


● Project delivery and contractual methods: delivery method/contract packaging; construction schedule and build-out process; contractor pool; insurance/rating agency.


● Approvals and regulatory: environmental clearance; socioeconomic impact; impact to general public/community; impact to existing infrastructure (public or other), and thirds parties.


● Urban planning, political and stakeholder priorities: alignment and station planning; transit-oriented development.


● Geotechnical considerations. Design and many more requirements will differ if the transport project is to be


rail/metro or road, whether single bore or twin tube. The former need stations and access, the later does not but requires extended entry and exit pathways. The former has difference aerodynamics and pressure waves from operations. Also, while the former carries more people at peak hours the travelling stock is usually pre-determined in size and pattern, whereas for the latter the peak and quiet hours bring highly variable traffic intensity plus the stock involved is more varied in type, size and number (motorcycles, cars, buses, trucks, etc). There are many variables for each transport mode as well as their basic


development and subsequent operational lives, and ultimately single tube or twin tunnel is but another factor, perhaps not the key one to determine a choice. Tunnelling technology may have brought a further variable into the mix but, as noted, everything is site-specific; there is no simple metric or universal and simplified as how to choose between them: single or twin.


smaller metro trains, it is perhaps understandable that where technology is advancing to permit much larger TBMs for solo tunnels to serve a project will lead to such examination. Vol 2 chapter structure is as follows: 1. Introduction 2. Scope 3. System configurations 4. TBM technology evolution and the large bore opportunity


5. Factors in alternatives review process 6. Opportunities and challenges with the single-bore option


7. Conclusions 8. references 9. Appendix A: Survey 10. Appendix B: Examples of large-diameter tunnel projects


November 2026 | 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45