Q&A Following their joint presentation to the BTS the three speakers – Michael Greiner and Dominik Hoerrle and also Xavier
Torelló Ciriano – took questions from the audience. The Q&A is edited for clarity, brevity and available space.
Q: Did you use strain gauges to measure the stresses in the openings? A – Michael Greiner (MG): We did so in two or three opening sets. The deformations were low, cracking was minimal. Once or twice we had tiny cracks on the back side of segments, around 0.1mm. Nothing was critical from a design perspective. Everything was within the design boundaries.
Q: What of durability of the segments? There is a lot of steel. A – Xavier Torello Ciriano (XTC): The overall durability strategy was first to limit crack width. The concrete itself is designed to limit access of aggressive agents. The steel elements inside the special segments are protected, coated and later injected. The durability concept is similar to what is used in bridge prestressing. A – MG: We also carried out a full mock-up of the grouting volumes to make sure we achieved a fully-filled cross-section. A – Dominik Hoerrle (DH): We tested flowability of the grout with transparent tubular sections. With one inlet and one outlet pipe, we could see that the grout flowed neatly and without air voids. The ring joints had sealings, to ensure the system was filled later with durable grout. In the pockets with the prestressing rods were there two alternatives: make the rods with stainless steel and then they are either exposed or fill the pockets later. HS2 was concerned about long-term reliability of fillings in the upper part of the tunnel. We chose stainless steel for the rods and the rod heads are the only steel that is exposed. All other steel has at least the minimum cover required for rebar steel.
Q: The dowels are very stiff and large. On Crossrail, dowels sometimes caused spalling or cracking when the ring was shoved home if there was a tolerance issue between rings. Did these very strong dowels cause cracking during ring build? A – MG: That was the point I mentioned earlier: we pitched the tolerances quite well. A – DH: The dowels fitted loosely, their diameter about 8mm-10mm smaller than the sleeve hole, so they could be inserted without constraint. The grout afterwards filled the remaining gap.
Q: What was the steel ratio for the segments, in kg/m3 A – DH: I cannot give it in kg/m3
? but a NTW segment is
350mm x 1900mm x 4200mm and a cage weighed approximately 1.3 tonne, including the steel elements. But we have been saving rebar works in the cross passages and so we have to weigh that against other solutions, such as would usually require a collar to take the hoop forces of the segments around the opening. We didn’t have this and our cross passages were fibre-reinforced (FR) rather than using rebar – which were only installed for the large top connections, not the standard cross passages.
Q: What was the carbon impact of the heavily reinforced special segments compared with a typical special segment plus a temporary frame usable on multiple openings? Was there a significant difference in steel use? A – MG: It depends on construction methodology, how much time is available, and how big and many times a temporary frame could be reused. We would definitely have needed several sets of frames, each containing a significant amount of steel. The special segments look massive, but there are limited number of segments. Looking at the temporary works elsewhere that approach would have needed more steel. Plus, there is saving in the cross passage lining and the avoidance of tunnel logistic constraints to transport rebars now not needed for the linings.
Q: Did you explore the use of steel fibres in the segments? A – MG: Yes, we did. We used steel fibres in the Atlas Road tunnel. At the beginning, during ECI, there was a long evaluation of what would be more cost-effective and more carbon-friendly: a slightly thicker lining or, as we went with, a thinner conventional lining with rebar. A – DH: It was a long debate. In the end it was about the geology in NTW, which was challenging where the heavy degree of over-consolidation of soils. The OCS was larger than in central London and added some uncertainty about the stresses. We checked for steel fibre options. The initial proposal was a 400mm-thick lining, and other HS2 contractors used 400mm. We also checked a 350mm-thick rebar lining for NTW, 340mm for NTE and 325mm for the Euston Tunnels. The outcome: we could use 350mm-thick lining with relatively minor reinforcement in normal segments, approx. 55kg/m3 60kg/m3
– per cage, while still accommodating the openings. We
were not confident that thickness with fibres alone would work all through NTW; we expected to need rebar anyway for at least a third of the drives. So we went for production with rebar only and slim standard cages. For the NTE and ET drives the rebar cage production was automated with robots.
Q: From a design-for-construction perspective, how did the propless opening set change the balance between structural redundancy, safety margins and buildability compared to traditional propped openings? A – MG: From a safety point of view, we avoided temporary works inside the tunnel. It was just normal ring building, which we can control. A – XTC: We did not cast collars to redirect the hoop forces of the open rings, but the cross passages and top ventilation structures restrain the tunnel segments from outside the tunnel. Since we omitted ring packings and joint faces are
concrete pressed against concrete, there remains residual compression force between segments which prevents deformations. Another important point is redundancy through ductility. The aim is not only to resist large loads but to guarantee enough capacity to prevent sudden failure when overloaded.
November 2026
| 17
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45